Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the construction of a new storage shed and headhouse at Shone Farm, with an estimated budget of $105,000.00, open to pre-qualified CUPCCAA contractors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The work of this contract may consist of the following: new modular 12’ X 24’ storage shed and 28’ x 28' headhouse - for staff use only and for non-educational use. Minor electrical work at headhouse. Add lighting, power outlets, and connection for ceiling fans. Minor plumbing work at headhouse. Add outdoor utility sink, interior hose bibb, and catch basin brain. Sitework: new concrete paving around buildings.
Posted Date
Dec 10, 2025
Due Date
Jan 16, 2026
Release: Dec 10, 2025
Close: Jan 16, 2026
The work of this contract may consist of the following: new modular 12’ X 24’ storage shed and 28’ x 28' headhouse - for staff use only and for non-educational use. Minor electrical work at headhouse. Add lighting, power outlets, and connection for ceiling fans. Minor plumbing work at headhouse. Add outdoor utility sink, interior hose bibb, and catch basin brain. Sitework: new concrete paving around buildings.
Premium
Access the largest public sector contact database
Historic headhouse and shambles renovations. Complete selective restoration work on the building exterior and structural repairs, MEP upgrades, and updating of the interior spaces. The exterior work includes brick masonry restoration, roof and gutter repairs, exterior woodwork restoration, window and door restoration and painting. Interior restoration work includes repairs to structural timber framing, wood flooring and stairs, plaster and painting. The first-floor spaces will be reconfigured to provide a publicly accessible restroom, mechanical room and storage spaces.
Posted Date
Nov 21, 2025
Due Date
Dec 15, 2025
Release: Nov 21, 2025
Close: Dec 15, 2025
Historic headhouse and shambles renovations. Complete selective restoration work on the building exterior and structural repairs, MEP upgrades, and updating of the interior spaces. The exterior work includes brick masonry restoration, roof and gutter repairs, exterior woodwork restoration, window and door restoration and painting. Interior restoration work includes repairs to structural timber framing, wood flooring and stairs, plaster and painting. The first-floor spaces will be reconfigured to provide a publicly accessible restroom, mechanical room and storage spaces.
AvailableConstruction of a new shed.
Posted Date
Nov 27, 2025
Due Date
Dec 15, 2025
Release: Nov 27, 2025
Close: Dec 15, 2025
Construction of a new shed.
AvailableThe Orange Water and Sewer Authority (OWASA) is seeking a qualified firm to provide professional engineering services for the design and construction phase of a new Storage Warehouse Facility at the Mason Farm Wastewater Treatment Plant, including design plans, specifications, permitting assistance, geotechnical and subsurface utility engineering assessments, and construction phase services. The project requires conditioned storage space for electrical equipment, at least one conditioned testing space, allows for future expansion, and has an estimated construction budget of $1,000,000–$1,500,000.
Posted Date
Mar 27, 2025
Due Date
May 1, 2026
Release: Mar 27, 2025
Close: May 1, 2026
The Orange Water and Sewer Authority (OWASA) is seeking a qualified firm to provide professional engineering services for the design and construction phase of a new Storage Warehouse Facility at the Mason Farm Wastewater Treatment Plant, including design plans, specifications, permitting assistance, geotechnical and subsurface utility engineering assessments, and construction phase services. The project requires conditioned storage space for electrical equipment, at least one conditioned testing space, allows for future expansion, and has an estimated construction budget of $1,000,000–$1,500,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis