1,150 tons Select Material Stone Backfill; 240 tons R-3 Rip Rap; 66 tons R-4 Rip Rap; 12 tons R-5 Rip Rap Choked with R-3 Rip Rap; 12 tons R-6 Rip Rap Choked with R-3 Rip Rap; 27 tons R-7 Rip Rap Choked with R-3 Rip Rap; 68 LF of 60" Dia. SLCPP; 81 tons of 8" Depth 2A Stone Base; 133 tons 2A Stone; 191 tons Superpave Asphalt Mixture
Design, 25mm, PG 64S-22 Base Course, 0.0 to <0.3 Million ESALs 5" Depth; 57 tons Superpave Asphalt Mixture Design, 9.5mm, PG 64S-22
Wearing Course, 0.0 to <0.3 Million ESALs, SRL-L, 1.5" Depth; 14 tons Superpave Asphalt Mixture Design, 9.5mm, PG 64S-22 Scratch Course, 0.0 to <0.3 Million ESALs, 0" – 1" Depth; 275 LF of 4" Double Yellow Painted Lines; 433 SY of Mill 1.5" Depth; 563 LF Type 31-S Guide Rail (With 7’ long Posts).