Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new amphitheater facility, dog park, roadway, and parking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The renovation and restoration of the existing outdoor paolo soleri amphitheater phases A, B, and C. Phase A: Full restoration, ADA improvements, lighting, power, seating, handrails, paint and finishes to existing outdoor amphitheater. Phase B: Full interior demolition of existing backstage building and improvements toinclude new dressing areas, green rooms, restroom facilities, staging areas, mechanical rooms, electrical rooms, AV rooms, and equipment areas. Phase C: New Steeland Concrete construction of outdoor amphitheater seating expansion up to 4000 people to include new public restrooms, concession area, and new ticketing offices.
Posted Date
Jan 5, 2026
Due Date
Apr 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Apr 3, 2026
The renovation and restoration of the existing outdoor paolo soleri amphitheater phases A, B, and C. Phase A: Full restoration, ADA improvements, lighting, power, seating, handrails, paint and finishes to existing outdoor amphitheater. Phase B: Full interior demolition of existing backstage building and improvements toinclude new dressing areas, green rooms, restroom facilities, staging areas, mechanical rooms, electrical rooms, AV rooms, and equipment areas. Phase C: New Steeland Concrete construction of outdoor amphitheater seating expansion up to 4000 people to include new public restrooms, concession area, and new ticketing offices.
AvailableThe project includes finishing out the interior of an existing wood post framed metal building into a gang of men / women / and family use toilet rooms on the site of the amphitheater. This project also consist of the renovation of the existing gang restrooms located inside the amphitheater turning those spaces into 2 – dressing room spaces and a general office space. The alternate bid will consist of demolition of the existing casework and interior finishes and installing new casework, walls, paint, flooring, suspended acoustical ceiling system.
Posted Date
Jan 17, 2026
Due Date
Feb 6, 2026
Release: Jan 17, 2026
Close: Feb 6, 2026
The project includes finishing out the interior of an existing wood post framed metal building into a gang of men / women / and family use toilet rooms on the site of the amphitheater. This project also consist of the renovation of the existing gang restrooms located inside the amphitheater turning those spaces into 2 – dressing room spaces and a general office space. The alternate bid will consist of demolition of the existing casework and interior finishes and installing new casework, walls, paint, flooring, suspended acoustical ceiling system.
AvailableAspinwall community park - phase 1 improvements.
Posted Date
Jan 13, 2026
Due Date
Feb 6, 2026
Release: Jan 13, 2026
Close: Feb 6, 2026
Aspinwall community park - phase 1 improvements.
AvailableFDR Amphitheater Rehabilitation Project focuses on the rehabilitation of a 1,300 SF brick masonry Amphitheater structure and surrounding hardscape in the Borough of Roosevelt. Rehabilitation of the Amphitheater includes replacement of approximately 1,000 individual bricks, repointing of all remaining stable brick facades (approximately 1,075 SF), replacement of 3 brick step sets, and the replacement of 325 SY of exposed aggregate concrete and brick pavement. The project also includes milling and surfacing of all surrounding asphalt pathways and the addition of a new asphalt pathway extension to the existing amphitheater. The project entails other improvements including new electrical outlets and lighting elements at the Amphitheater (in-step lights and two light poles with flood lights) and connecting electrical supply to existing nearby utility shed. An existing bronze monument with natural stone base is to be protected with plywood enclosure for the project duration and the stone base cleaned recaulked. Minor grading is also proposed along the new section of asphalt pathway, and all disturbed soils are to be reseeded and sodded with turf grass. A few shrubs and trees are also proposed to be planted between the Amphitheater and existing utility shed.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
FDR Amphitheater Rehabilitation Project focuses on the rehabilitation of a 1,300 SF brick masonry Amphitheater structure and surrounding hardscape in the Borough of Roosevelt. Rehabilitation of the Amphitheater includes replacement of approximately 1,000 individual bricks, repointing of all remaining stable brick facades (approximately 1,075 SF), replacement of 3 brick step sets, and the replacement of 325 SY of exposed aggregate concrete and brick pavement. The project also includes milling and surfacing of all surrounding asphalt pathways and the addition of a new asphalt pathway extension to the existing amphitheater. The project entails other improvements including new electrical outlets and lighting elements at the Amphitheater (in-step lights and two light poles with flood lights) and connecting electrical supply to existing nearby utility shed. An existing bronze monument with natural stone base is to be protected with plywood enclosure for the project duration and the stone base cleaned recaulked. Minor grading is also proposed along the new section of asphalt pathway, and all disturbed soils are to be reseeded and sodded with turf grass. A few shrubs and trees are also proposed to be planted between the Amphitheater and existing utility shed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →