Summary
Roadway improvement. Base Bid and Option #1, #2, & #3: Base Bid, including: 41,000± SY Asphalt Pavement Milling (2"); 4,950± tons Surface Course 9.5M64 HMA (2"); 990± tons Leveling Course 9.5M64 HMA (2"); 2,600 gallons tack coat; 220± LF concrete curb removal and replacement; 1,000± LF sawcut; Type B curb piece retrofit faceplates (63± units); Bicycle safe grates (63± units); Thermoplastic pavement marking (stop bars and crosswalk striping) (165± LF); Option 1, including: 19,000± SY Asphalt Pavement Milling (2”); 2,300± tons Surface Course 9.5M64 HMA (2"); 450± tons Leveling Course 9.5M64 HMA (2"); 30± LF concrete curb removal and replacement; 1,200 gallons tack coat; Type B curb piece retrofit faceplates (24± units); and Thermoplastic pavement marking (stop bars and crosswalk striping) (150± LF); Option 2, including: 10,000± SY Asphalt Pavement Milling (2"); 1,200± tons Surface Course 9.5M64 HMA (2"); 240± tons Leveling Course 9.5M64 HMA (2"); 620 gallons tack coat; 185± linear feet concrete curb removal and replacement; Type B curb piece retrofit faceplates (18± units); and Thermoplastic pavement marking (stop bars and crosswalk striping) (50± LF);. Option 3, including: 10,000± SY Asphalt Pavement Milling (2”); 1,200± tons Surface Course 9.5M64 HMA (2”); 240± tons Leveling Course 9.5M64 HMA (2"); 620 gallons tack coat; 100± LF concrete curb removal and replacement; Type B curb piece retrofit faceplates (13± units); Bicycle safe grates (11± units); and Thermoplastic pavement marking (stop bars and crosswalk striping) (170± LF)