Summary
Project involves ADA improvements in Borough, including but not limited to the following: 3.5" Profile Milling, Soft Spot Repair, Placement of 2" of 19mm Superpave Binder Course, Placement of 1.5" of 9.5mm Fine Graded Superpave Wearing Course, Site Clearing and
Miscellaneous Removals, Removal of Existing Concrete Curb and Sidewalk, Installation of Concrete Sidewalk and Four (4) ADA Ramps, Removal and Replacement of Style Hooded Inlet with Type-M Inlet, Installation of Storm Manhole, Installation of Storm Sewer Pipe, Stamped Asphalt Crosswalk, Crosswalk Striping, Traffic Control, Resident Notification, and Restoration, complete in place.