Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Green Bay
2,624 LF, silt fence; 15,844 SY, erosion mat class II, type b; 2 ea, tracking pad; 2 ea, temporary ditch check; 1;f, construction staking (project); traffic control, dredging; hauling; 15 lb, seeding mixture #40; 32.5 lb, native seed mix; 6 LF, erosion rolls.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lexington
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
Posted Date
-
Due Date
Jan 14, 2026
Release: -
City of Lexington
Close: Jan 14, 2026
The Woods Creek Stormwater BMP Pond which includes (all values are approximate) Stormwater management pond with approximately 100,000 CF of internal storage, 200 LF stormdrain, 5 stormdrain structures, tree removal, rock removal, landscaping, testing during construction, restoration, appurtenances, erosion and sediment control, material export; material import. Price shall encompass a complete project, per the plans and specifications, to include but not limited to, mobilization; permits; erosion & sediment control; demolition; trenching, sheeting, shoring and dewatering; bedding, pipe installation, backfill, and compaction; utility replacements, relocations, or temporary bracing and shoring; temporary patching and permanent pavement replacement; reestablishment of green areas and landscaping; and all elements necessary to complete the Work in a complete and first class manner.
AvailableTown of Greenwich
Work includes mechanical dredging to remove and dispose offsite accumulated sediment in 16,400 ft2 of the sediment forebays of the upper pond.
Posted Date
Nov 5, 2025
Due Date
Nov 26, 2025
Release: Nov 5, 2025
Town of Greenwich
Close: Nov 26, 2025
Work includes mechanical dredging to remove and dispose offsite accumulated sediment in 16,400 ft2 of the sediment forebays of the upper pond.
AvailableCity of Twinsburg
2026 Waterford Pond Dredging Phase 1.
Posted Date
Oct 28, 2025
Due Date
Nov 20, 2025
Release: Oct 28, 2025
City of Twinsburg
Close: Nov 20, 2025
2026 Waterford Pond Dredging Phase 1.
AvailableCity of Moline
The City of Moline seeks bids for the 2025 Stormwater Dredging Project to restore stormwater flow and drainage capacity along the east-side drainage channel adjacent to 41st Street. The project involves sediment removal to improve hydraulic connectivity and must comply with prevailing wage requirements. Bidding is conducted through IONWAVE's website, with a virtual bid opening via RingCentral.
Posted Date
Nov 6, 2025
Due Date
Nov 18, 2025
Release: Nov 6, 2025
City of Moline
Close: Nov 18, 2025
The City of Moline seeks bids for the 2025 Stormwater Dredging Project to restore stormwater flow and drainage capacity along the east-side drainage channel adjacent to 41st Street. The project involves sediment removal to improve hydraulic connectivity and must comply with prevailing wage requirements. Bidding is conducted through IONWAVE's website, with a virtual bid opening via RingCentral.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis