Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Moline
The City of Moline seeks bids for the 2025 Stormwater Dredging Project to restore stormwater flow and drainage capacity along the east-side drainage channel adjacent to 41st Street. The project involves sediment removal to improve hydraulic connectivity and must comply with prevailing wage requirements. Bidding is conducted through IONWAVE's website, with a virtual bid opening via RingCentral.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Green Bay
2,624 LF, silt fence; 15,844 SY, erosion mat class II, type b; 2 ea, tracking pad; 2 ea, temporary ditch check; 1;f, construction staking (project); traffic control, dredging; hauling; 15 lb, seeding mixture #40; 32.5 lb, native seed mix; 6 LF, erosion rolls.
Posted Date
Nov 17, 2025
Due Date
Dec 9, 2025
Release: Nov 17, 2025
City of Green Bay
Close: Dec 9, 2025
2,624 LF, silt fence; 15,844 SY, erosion mat class II, type b; 2 ea, tracking pad; 2 ea, temporary ditch check; 1;f, construction staking (project); traffic control, dredging; hauling; 15 lb, seeding mixture #40; 32.5 lb, native seed mix; 6 LF, erosion rolls.
AvailableMississippi Department of Marine Resources
The Mississippi Department of Marine Resources seeks bids for the Kreole Stormwater Project, requiring equipment, labor, materials, and expertise in earthwork, stormwater management, sedimentation prevention, and landscape installation in Mississippi. Bidders must comply with local building codes and procurement requirements.
Posted Date
-
Due Date
Dec 8, 2025
Release: -
Mississippi Department of Marine Resources
Close: Dec 8, 2025
The Mississippi Department of Marine Resources seeks bids for the Kreole Stormwater Project, requiring equipment, labor, materials, and expertise in earthwork, stormwater management, sedimentation prevention, and landscape installation in Mississippi. Bidders must comply with local building codes and procurement requirements.
AvailableCity of Woodbury
Work includes approx 0.5 AC clearing; 2 EA dewatering; 18 LF of 8" ductile iron pipe sewer. See outside link.
Posted Date
Nov 7, 2025
Due Date
Nov 24, 2025
Release: Nov 7, 2025
City of Woodbury
Close: Nov 24, 2025
Work includes approx 0.5 AC clearing; 2 EA dewatering; 18 LF of 8" ductile iron pipe sewer. See outside link.
AvailableAllegheny County
Allegheny County, PA is soliciting sealed bids for a stormwater inlet project in the Borough of Turtle Creek. Bids are due via the Bonfire portal by December 9, 2025 at 1:00 PM EST.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Allegheny County
Close: Dec 9, 2025
Allegheny County, PA is soliciting sealed bids for a stormwater inlet project in the Borough of Turtle Creek. Bids are due via the Bonfire portal by December 9, 2025 at 1:00 PM EST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis