Sewer pump station rehabilitation including: demolition of existing concrete; demolition of existing wet well cone section; demolition of existing pumps and associated controls; installation of new wet well riser section and access door; installation of new pumps, plug valves, check valves, control panel, and level control; installation of new site flatwork concrete; modifications to existing discharge manhole.
What to Include In Your Proposal
Starbridge can help you:
✓
Pain points mentioned in board meetings and strategic plans
✓
Instantly outline and draft all requirements
✓
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
✓
Get ahead of RFPs — target accounts planning budget or ending contracts soon
✓
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
✓
Starbridge.ai books 30 - 40% of leads into meetings
Files
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes the rehabilitation and upgrades to the major mechanical equipment, electrical equipment, and other appurtenances of the pump station. The mechanical scope involves replacement of main pumps and motors. The electrical scope involves replacement of motor control center, pump station lighting system, as well as other electrical components. The structural scope involves the installation of a half-ton crane rail hoist system on the exterior of the station. The civil scope involves the repair and reconstruction of the station's access road, parking lot, and slope stabilization.
Project includes the rehabilitation and upgrades to the major mechanical equipment, electrical equipment, and other appurtenances of the pump station. The mechanical scope involves replacement of main pumps and motors. The electrical scope involves replacement of motor control center, pump station lighting system, as well as other electrical components. The structural scope involves the installation of a half-ton crane rail hoist system on the exterior of the station. The civil scope involves the repair and reconstruction of the station's access road, parking lot, and slope stabilization.
The project includes constructing a new 12" sewer gravity main, and three new 60" diameter manholes. Includes excavation and shoring; construct 12" pvc (sdr-26) sewer main; construct 60" sewer manhole with polyurethane lining & composite frame & cover; connecting new 12" sewer to existing 48" dia. Manhole; trench pavement repair; 2" pavement grind & overlay; median curb, median pavement, signing, pavement striping & traffic loop repair.
The project includes constructing a new 12" sewer gravity main, and three new 60" diameter manholes. Includes excavation and shoring; construct 12" pvc (sdr-26) sewer main; construct 60" sewer manhole with polyurethane lining & composite frame & cover; connecting new 12" sewer to existing 48" dia. Manhole; trench pavement repair; 2" pavement grind & overlay; median curb, median pavement, signing, pavement striping & traffic loop repair.
Work consists of rehabilitation of the narrows pump station including selective demolition of the interior piping, pumping equipment, miscellaneous metals, and electrical utility service, distribution equipment, and ancillary devices in the station, installation of new 200a electric service, meter, main circuit breaker, automatic transfer switch (ats), panelboard, lighting, receptacles, grounding system, sump pump, packaged duplex pumping system, pump control panel, and associated instruments, valves, piping and supports, pump station bypass structure, temporary sewer bypass system, access ladder, handrails, metal platform, and modifications to existing equipment and circuitry to remain at the pump station. Subtrades: miscellaneous metals and ornamental iron, electrical work.
Rehabilitation of the structural, mechanical and electrical components at three(3) existing sanitary sewer pump stations. Includes electrical, mechanical, site and structural rehabilitation of two(2) dry pit vertical pump shaft sewage pump stations and the replacement of an existing flooded suction subgrade dry well pump station with a new submersible pump type station with larger wet well including furnishing of all labor, materials, and equipment necessary to complete the work
Rehabilitation of the structural, mechanical and electrical components at three(3) existing sanitary sewer pump stations. Includes electrical, mechanical, site and structural rehabilitation of two(2) dry pit vertical pump shaft sewage pump stations and the replacement of an existing flooded suction subgrade dry well pump station with a new submersible pump type station with larger wet well including furnishing of all labor, materials, and equipment necessary to complete the work
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
Work consists of rehabilitation of the narrows pump station including selective demolition of the interior piping, pumping equipment, miscellaneous metals, and electrical utility service, distribution equipment, and ancillary devices in the station, installation of new 200a electric service, meter, main circuit breaker, automatic transfer switch (ats), panelboard, lighting, receptacles, grounding system, sump pump, packaged duplex pumping system, pump control panel, and associated instruments, valves, piping and supports, pump station bypass structure, temporary sewer bypass system, access ladder, handrails, metal platform, and modifications to existing equipment and circuitry to remain at the pump station. Subtrades: miscellaneous metals and ornamental iron, electrical work.