Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the following work: reinforced concrete low water crossing, loose rip rap, grading and related work. Work includes 5,900 CY roadway excavation (plan quantity); 200 CY untreated base course (plan quantity); 350 SY concrete low water crossing and headwall; 1,280 CY riprap, d50 = 22 inches; 960 SY geotextile filter fabric.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of replacement of low water crossing includes remove a 175' (feet) X 21' (feet) concrete slab, dig and install five (5)- 30" (inch) X 24' (feet) plastic pipes (furnished by customer).
Posted Date
Dec 12, 2025
Due Date
Jan 20, 2026
Release: Dec 12, 2025
Close: Jan 20, 2026
Work consists of replacement of low water crossing includes remove a 175' (feet) X 21' (feet) concrete slab, dig and install five (5)- 30" (inch) X 24' (feet) plastic pipes (furnished by customer).
AvailableProposals are requested for a pedestrian crossing, safety, and concept study on Creek Road from Union Park Avenue to 3500 East.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Proposals are requested for a pedestrian crossing, safety, and concept study on Creek Road from Union Park Avenue to 3500 East.
Project includes all work and material necessary to remove bridge and build a low water crossing, all associated earthwork, construction of reinforced concrete top and slopes and revetment.
Posted Date
Dec 10, 2025
Due Date
Jan 18, 2026
Release: Dec 10, 2025
Close: Jan 18, 2026
Project includes all work and material necessary to remove bridge and build a low water crossing, all associated earthwork, construction of reinforced concrete top and slopes and revetment.
AvailablePaving an HMA overlay on Redmond Field Road and a segment of 1100 North, including a lane level and approaches at specified locations.
Posted Date
Dec 11, 2025
Due Date
Jan 7, 2026
Release: Dec 11, 2025
Close: Jan 7, 2026
Paving an HMA overlay on Redmond Field Road and a segment of 1100 North, including a lane level and approaches at specified locations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis