Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Colorado State University Fort Collins
Colorado State University issued an Invitation for Bid titled 'Settlement notice: Newsom Roof Replacement Bid Pack 2' seeking contractors to replace the Newsom building roof. Bids are due December 1, 2025 at 4:00 PM PST (physical submission) and the posting directs users to the original BidNetDirect posting for documentation.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Montgomery County
Repair, replace and maintain all roofing at the MCCF over the course of multiple years. At completion of the program, the total roof area addressed at the facility will be approx 316,000 SF. The Phase 2 project includes replacement of existing ballasted EPDM and adhered EPDM roofs with an adhered EPDM system across twelve roof areas at approx 60,470 SF. Collateral work associated with these roof areas includes but is not limited to the removal and replacement of rooftop HVAC units, removal and replacement of a mechanical platform, the removal of abandoned rooftop equipment, infill of the deck openings and the addition of roof drains. Other work includes lightning protection, masonry repointing and the replacement of masonry control joints.
Posted Date
Oct 21, 2025
Due Date
Nov 24, 2025
Release: Oct 21, 2025
Montgomery County
Close: Nov 24, 2025
Repair, replace and maintain all roofing at the MCCF over the course of multiple years. At completion of the program, the total roof area addressed at the facility will be approx 316,000 SF. The Phase 2 project includes replacement of existing ballasted EPDM and adhered EPDM roofs with an adhered EPDM system across twelve roof areas at approx 60,470 SF. Collateral work associated with these roof areas includes but is not limited to the removal and replacement of rooftop HVAC units, removal and replacement of a mechanical platform, the removal of abandoned rooftop equipment, infill of the deck openings and the addition of roof drains. Other work includes lightning protection, masonry repointing and the replacement of masonry control joints.
AvailableMontgomery County
The Montgomery County PA Correctional Facility (MCCF) is soliciting bids for Phase 2 of a roof replacement program covering approximately 60,470 square feet across twelve roof areas, including removal and replacement of rooftop HVAC units, platform work, masonry repointing, lightning protection, and new roof drains. The solicitation is an ITB posted on the Montgomery County Bonfire portal, opened Oct 21, 2025 and closing Nov 24, 2025 at 10:00 AM (local time).
Posted Date
Oct 21, 2025
Due Date
Nov 24, 2025
Release: Oct 21, 2025
Montgomery County
Close: Nov 24, 2025
The Montgomery County PA Correctional Facility (MCCF) is soliciting bids for Phase 2 of a roof replacement program covering approximately 60,470 square feet across twelve roof areas, including removal and replacement of rooftop HVAC units, platform work, masonry repointing, lightning protection, and new roof drains. The solicitation is an ITB posted on the Montgomery County Bonfire portal, opened Oct 21, 2025 and closing Nov 24, 2025 at 10:00 AM (local time).
AvailableHighland County
Work include roof replacement.
Posted Date
Oct 8, 2025
Due Date
Dec 2, 2025
Release: Oct 8, 2025
Highland County
Close: Dec 2, 2025
Work include roof replacement.
AvailableTown of Farmington
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of epdm membranes, underlayment, and flat and tapered insulations. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Town of Farmington
Close: Dec 2, 2025
Work consists of a partial roof replacement to an existing building. Removal of existing membrane roofing, insulation, cant strips and tapered edges, and metal flashings. Offsite disposal of all removed materials. Removal and replacement of existing roof accessories. Removal and replacement of deteriorated roof decking and wood blocking. Removal and replacement of existing roof drains and related piping and insulation. Provision and installation of epdm membranes, underlayment, and flat and tapered insulations. Provision and installation of new flashings, caps, fasciae, and other trim metal work as detailed and specified.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis