Retrieving RFP details
Release
Close
Montgomery County
Repair, replace and maintain all roofing at the MCCF over the course of multiple years. At completion of the program, the total roof area addressed at the facility will be approx 316,000 SF. The Phase 2 project includes replacement of existing ballasted EPDM and adhered EPDM roofs with an adhered EPDM system across twelve roof areas at approx 60,470 SF. Collateral work associated with these roof areas includes but is not limited to the removal and replacement of rooftop HVAC units, removal and replacement of a mechanical platform, the removal of abandoned rooftop equipment, infill of the deck openings and the addition of roof drains. Other work includes lightning protection, masonry repointing and the replacement of masonry control joints.
6-25 - pub - MCCF Roof Replacement Phase 2
zip
Ascension Parish School District
Work includes roof replacement.
Alvord Unified School District
Roof Repairs.
City of Statesboro
Work include a partial replacement of the roof of the joe brannen building 2. The replacement of the roof of the wastewater pump building.
Release
Oct 21, 2025
Close
Nov 20, 2025