Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Investigate and record service line materials using vacuum excavation and replace Lead or galvanized-requiring-replacement service lines as encountered. Contractor will also be asked to pothole at the water main to identify the connector material where feasible without removing existing pavement/sidewalk. Bidder agrees to furnish all materials and equipment and to perform all labor necessary to pothole and identify the existing service line material on +/-1,691 metered services, identify connector material when feasible/requested, and replace service lines as requested.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide water utility service line inventory consulting service.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Close: Dec 29, 2025
Provide water utility service line inventory consulting service.
AvailablePremium
Access the largest public sector contact database
The Work shall include: Hydro-excavation of approx. 460 water service lines on street side and property side (defined in relation to the right-of-way line) to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 545 total replacements are anticipated. Water service line replacements will consist of connecting to the existing water main, installation of water service line tubing, installation of curb stops, boxes, and lids, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
The Work shall include: Hydro-excavation of approx. 460 water service lines on street side and property side (defined in relation to the right-of-way line) to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 545 total replacements are anticipated. Water service line replacements will consist of connecting to the existing water main, installation of water service line tubing, installation of curb stops, boxes, and lids, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
AvailableThe Work shall include: Hydro-excavation of approx. 430 Utility-side water service lines and approx. 430 Customer-side water service lines to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 475 utility-side, customer-side, or full water service line replacements are anticipated. Replacement will consist of connecting to the existing water main, installation of service line on the utility-side, customer-side, or both, new meter pits, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
The Work shall include: Hydro-excavation of approx. 430 Utility-side water service lines and approx. 430 Customer-side water service lines to identify pipe material, size, and depth. Based on the results of the investigations, coordinate and replace identified lead and galvanized service lines. Approx. 475 utility-side, customer-side, or full water service line replacements are anticipated. Replacement will consist of connecting to the existing water main, installation of service line on the utility-side, customer-side, or both, new meter pits, pavement repair, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation.
AvailableUnit Price Lead Service Line Replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Close: Dec 17, 2025
Unit Price Lead Service Line Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis