Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
project consists of new construction of two new buildings. One building is 16,000 SF and the other is 18,000 SF. The scope of this project includes but is not limited to clearing, mass grading, modular retaining walls, site utilities, concrete and asphalt paving, structural concrete, omni block masonry, cast stone, misc structural steel, decorative metal fence, casework, p-lam cabinets, solid surface counter tops, rough carpentry, wood framing, wood trusses, waterproofing, sealants and caulking, TPO roofing system, mechanical screen wall, insulation, fiber cement trim and paneling, louvers, geolam trim, aluminum storefront, doors frames and hardware, OHD, drywall, ACT, linear stained wood ceilings, hard tile, vinyl flooring, resilient flooring, sealed concrete, quarry tile, electro-static dissipative tile, rubber base, rubber gym floor, FEC, toilet accessories, signage, aluminum awnings, misc specialties, residential appliances, commercial kitchen equipment, fire suppression, mechanical, plumbing, and electrical including fire alarm and other low voltage systems. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of new construction. See outside link.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
Project consists of new construction. See outside link.
AvailableProject consists of new construction. See outside link.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
Project consists of new construction. See outside link.
AvailableProject consists of new construction. See outside link.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Project consists of new construction. See outside link.
AvailableProject consists of new construction and site development. See outside link.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
Project consists of new construction and site development. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis