Summary
Work includes commissary fridge/freezer replacement. The purpose of these replacements is to restore efficient cooling performance, improve reliability, and provide a safe environment for food storage. The project includes three (3) new cooling units installations. Replace evaporators and condensers for the walk-in freezer. This requires two units to adequately cool the room to -5 fahrenheit; replace single refrigerator unit both evaporator and condenser. Cooling target to +35 fahrenheit; remove all existing equipment and dispose of them safely and in compliance with the state of Washington; removal and environmentally safe disposal of all replaced existing equipment and materials.