Summary
Work includes 25 SY supplementary clearing and grubbing; 4 EA select tree removal (4 to 8 inch diameter); 161 CY undercut excavation; 24 TN rip rap, class 1; 63 SY geotextile for drainage (type 2); 154 SY matting for erosion control; 2,530 SY seeding and mulching; 2,329 SY milling asphalt pavement, 1.5" depth; 302 TN asphalt concrete base course, type b25. 0b; 243 LF concrete valley gutter; 43 SY 4-inch concrete sidewalk; 10 LF masonry drainage structure; 86 LF 15-inch r. C. Pipe culverts, class iii (0 to 5-feet); 20 LF 6" water (dip); 30 LF 12" water (dip); 1 EA furnish and install fire hydrant; 60 LF 8" sanitary gravity sewer (dip).