Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 191 LF of removal of structures and obstructions; 12 SY removal of concrete walks and drive; 248 LF of silt fence; 26 SY of 6" crushed aggregate base course; 7 Gal of prime coat(.25Gal/SY); 2 EA of junction box(7x7); 12 SY of 4" concrete sidewalk; 204 LF of 48" CPPPDW pipe line in place; 1,006 SY of sod lawn; 32 LF of sawcutting; 5 EA of pile bent caps; 590 LF of temporary pedestrian fence; 2 EA of reconnect esxisting culverts to new junction box
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of drainage repair services for Bolton's Branch Drainage Improvements.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
Procurement of drainage repair services for Bolton's Branch Drainage Improvements.
AvailableRelease: Dec 16, 2025
Close: Jan 20, 2026
Work includes drainage improvements.
Available(2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
(2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. See outside link.
AvailableDrainage Improvements: Work consists of construction of drainage improvements including, but not limited to, HDPE piping, drainage structures and a trapezoidal riprap channel with 8-foot bottom width on a steeply sloped area. The work is located on Block 67, Lot 12 on Hillside Avenue, currently an undeveloped and wooded lot containing public walking trails within the Township.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Drainage Improvements: Work consists of construction of drainage improvements including, but not limited to, HDPE piping, drainage structures and a trapezoidal riprap channel with 8-foot bottom width on a steeply sloped area. The work is located on Block 67, Lot 12 on Hillside Avenue, currently an undeveloped and wooded lot containing public walking trails within the Township.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis