Summary
Pulverization of the existing roadway, full depth reclamation, as well as shaping and paving the full roadway width [+/- 22 feet] for approx. 1,250 LF. Other construction activities include stormwater conveyance improvements, installation of a cement concrete curb and gutter, cement concrete sidewalks, ADA ramps, off street parking on W Pine Street, permanent pavement markings, installation of rapid flashing beacons, signage, traffic control and other work. Clearing and grubbing, removal of structures and obstructions, removing asphalt concrete pavement, excavation, embankment, and grading, unsuitable foundation excavation, Incl., crushed surfacing top course, pavement pulverization, seeding and fertilizing, 6" perforated under drain pipe. See attached file.