Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of existing features including existing sidewalks, curb and gutter, landscaping, irrigation piping (includes capping existing services); construction of concrete parking and sidewalks with handicapped accessibility, new integral curb and gutter, installing concrete parking stops and pavement markings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Pass Christian, Mississippi, seeks bids for the construction of off-street diagonal parking improvements along Scenic Drive, including demolition of existing features and construction of new concrete parking, sidewalks, and curb and gutter.
Posted Date
-
Due Date
Jan 6, 2026
Close: Jan 6, 2026
The City of Pass Christian, Mississippi, seeks bids for the construction of off-street diagonal parking improvements along Scenic Drive, including demolition of existing features and construction of new concrete parking, sidewalks, and curb and gutter.
Premium
Access the largest public sector contact database
The project will replace the end-of-life asphalt roadway with a new 20-year-life pavement designed in accordance with port and caltrans standards, reducing long-term maintenance costs and bringing the roadway up to current design requirements. To improve traffic flow, enhance safety, and reduce vehicle weaving, the project will reconfigure lanes to separate cars and trucks, consolidate and reconfigure existing ramps, and incorporate intelligent transportation system (its) elements such as dynamic lane-assignment sign boards, changeable message signs, and traffic monitoring. Wayfinding will be improved through the installation of new traffic signs and roadway striping. The project also includes drainage upgrades with a new storm drain system and treatment devices, as well as area beautification through new landscaping, irrigation, and street lighting.
Posted Date
Nov 30, 2025
Due Date
Dec 16, 2025
Release: Nov 30, 2025
Close: Dec 16, 2025
The project will replace the end-of-life asphalt roadway with a new 20-year-life pavement designed in accordance with port and caltrans standards, reducing long-term maintenance costs and bringing the roadway up to current design requirements. To improve traffic flow, enhance safety, and reduce vehicle weaving, the project will reconfigure lanes to separate cars and trucks, consolidate and reconfigure existing ramps, and incorporate intelligent transportation system (its) elements such as dynamic lane-assignment sign boards, changeable message signs, and traffic monitoring. Wayfinding will be improved through the installation of new traffic signs and roadway striping. The project also includes drainage upgrades with a new storm drain system and treatment devices, as well as area beautification through new landscaping, irrigation, and street lighting.
AvailableImprovements to the existing asphalt parking lot and addition of durable drive isles.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Improvements to the existing asphalt parking lot and addition of durable drive isles.
AvailableImprovements to the existing asphalt parking lot and addition of durable drive isles.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Improvements to the existing asphalt parking lot and addition of durable drive isles.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis