City of Long Beach
The project will replace the end-of-life asphalt roadway with a new 20-year-life pavement designed in accordance with port and caltrans standards, reducing long-term maintenance costs and bringing the roadway up to current design requirements. To improve traffic flow, enhance safety, and reduce vehicle weaving, the project will reconfigure lanes to separate cars and trucks, consolidate and reconfigure existing ramps, and incorporate intelligent transportation system (its) elements such as dynamic lane-assignment sign boards, changeable message signs, and traffic monitoring. Wayfinding will be improved through the installation of new traffic signs and roadway striping. The project also includes drainage upgrades with a new storm drain system and treatment devices, as well as area beautification through new landscaping, irrigation, and street lighting.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Southbridge
Roadway & infrastructure improvements. Work includes full depth pavement reconstruction, installation of new cement concrete walk, resetting existing and new granite curb, new ADA pedestrian ramps, drainage upgrades including installation of new catch basin, drop inlet and manhole structures, installation of new modular or MSE retaining wall, signage, pavement markings and other incidental work.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Town of Southbridge
Close: Nov 21, 2025
Roadway & infrastructure improvements. Work includes full depth pavement reconstruction, installation of new cement concrete walk, resetting existing and new granite curb, new ADA pedestrian ramps, drainage upgrades including installation of new catch basin, drop inlet and manhole structures, installation of new modular or MSE retaining wall, signage, pavement markings and other incidental work.
AvailableCity of Centralia
Work includes pavement removal, concrete curb and gutter, pcc pavement, driveway improvements, storm sewer improvements, pavement patching and other miscellaneous work to complete the project. Earth excavation 246 CY; trench backfill 31 CY; aggregate-temp access 10 ton; pcc pvt 8 jointed 939 SY; protective coat 939 SY; pcc driveway pavt 6 23 SY; pcc sidewalk 4 74 SY; sidewalk removal 85 SF. See attached file.
Posted Date
Nov 6, 2025
Due Date
Nov 20, 2025
Release: Nov 6, 2025
City of Centralia
Close: Nov 20, 2025
Work includes pavement removal, concrete curb and gutter, pcc pavement, driveway improvements, storm sewer improvements, pavement patching and other miscellaneous work to complete the project. Earth excavation 246 CY; trench backfill 31 CY; aggregate-temp access 10 ton; pcc pvt 8 jointed 939 SY; protective coat 939 SY; pcc driveway pavt 6 23 SY; pcc sidewalk 4 74 SY; sidewalk removal 85 SF. See attached file.
AvailableLoudoun County
Provide Roadway and Civil Design Services for the Village of Waterford Infrastructure Improvements (the “Project”). The work will include planning, design, right-of-way acquisition assistance, utility relocation coordination, and construction assistance for the infrastructure improvements, in and adjacent to, the Village of Waterford. The scope of work may include but is not limited to traffic calming, road, sidewalk and pavement improvements, stormwater management, utility relocations, new water distribution system, public meetings, and extensive stakeholder coordination. The Offeror will be responsible for performing the roadway design, will support right-of-way acquisition, utility relocation, procurement efforts, and provide assistance during construction. Please note the consultant’s proposal will be evaluated on the full scope of the Project.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
Loudoun County
Close: Nov 20, 2025
Detroit Land Bank Authority
The Detroit Land Bank Authority (DLBA) invites qualified contractors to submit bids for Construction Services and Contractor Federal Prequalification for the Blight Elimination Round Four projects. Work performed is subject to Davis-Bacon/Prevailing Rates.
Posted Date
Nov 17, 2025
Due Date
Jan 7, 2026
Release: Nov 17, 2025
Detroit Land Bank Authority
Close: Jan 7, 2026
The Detroit Land Bank Authority (DLBA) invites qualified contractors to submit bids for Construction Services and Contractor Federal Prequalification for the Blight Elimination Round Four projects. Work performed is subject to Davis-Bacon/Prevailing Rates.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Provide Roadway and Civil Design Services for the Village of Waterford Infrastructure Improvements (the “Project”). The work will include planning, design, right-of-way acquisition assistance, utility relocation coordination, and construction assistance for the infrastructure improvements, in and adjacent to, the Village of Waterford. The scope of work may include but is not limited to traffic calming, road, sidewalk and pavement improvements, stormwater management, utility relocations, new water distribution system, public meetings, and extensive stakeholder coordination. The Offeror will be responsible for performing the roadway design, will support right-of-way acquisition, utility relocation, procurement efforts, and provide assistance during construction. Please note the consultant’s proposal will be evaluated on the full scope of the Project.