Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project in includes the removal of the existing 72" steel culvert and concrete headwalls. Installation of 14'w x 7'h x 40' box culvert and associated roadway repair.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consist of one (1) Town culvert across West Mineral Point Road and six (6) private residence driveway culverts and approx. 900' of ditch work and 2,000 SY of reseeding.
Posted Date
Jan 15, 2026
Due Date
Feb 7, 2026
Release: Jan 15, 2026
Close: Feb 7, 2026
Project consist of one (1) Town culvert across West Mineral Point Road and six (6) private residence driveway culverts and approx. 900' of ditch work and 2,000 SY of reseeding.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
1.Aluminum arch culvert replacement\r 2.Concrete street, sidewalk, and ditch replacement
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
1.Aluminum arch culvert replacement\r 2.Concrete street, sidewalk, and ditch replacement
AvailableProvide fabrication, delivery, and placement of a precast concrete box culvert. Structural design, fabrication, storage, delivery, placement, and post tensioning of a 7.5' W x 4' H x 120' L precast concrete box culvert and the corresponding precast concrete end sections.
Posted Date
Jan 17, 2026
Due Date
Feb 10, 2026
Release: Jan 17, 2026
Close: Feb 10, 2026
Provide fabrication, delivery, and placement of a precast concrete box culvert. Structural design, fabrication, storage, delivery, placement, and post tensioning of a 7.5' W x 4' H x 120' L precast concrete box culvert and the corresponding precast concrete end sections.
AvailableWork includes removal of asphalt and concrete sidewalk, removal of existing structure, culvert pipe installation, pave HMA, form diversion box and endwall, tie rebar diversion box and endwall, pour concrete diversion box and endwall.
Posted Date
Jan 13, 2026
Due Date
Feb 11, 2026
Release: Jan 13, 2026
Close: Feb 11, 2026
Work includes removal of asphalt and concrete sidewalk, removal of existing structure, culvert pipe installation, pave HMA, form diversion box and endwall, tie rebar diversion box and endwall, pour concrete diversion box and endwall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →