Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and placement of soil includes total sand: 60-65 percent, total silt: 17. 1 percent, total clay: 22. 9 percent.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
furnish and install twelve (12) canopies and replace twelve (12) existing baseball field dugout foundations at various baseball fields. 270 S.Y. Concrete Pad Reinforced; 12 Unit Canopy; 50 SY Hot Mix Asphalt Sidewalk, 6" Thick.
Posted Date
Sep 21, 2025
Due Date
Dec 16, 2025
Release: Sep 21, 2025
Close: Dec 16, 2025
furnish and install twelve (12) canopies and replace twelve (12) existing baseball field dugout foundations at various baseball fields. 270 S.Y. Concrete Pad Reinforced; 12 Unit Canopy; 50 SY Hot Mix Asphalt Sidewalk, 6" Thick.
AvailablePremium
Access the largest public sector contact database
The Town of Sardis, Mississippi is soliciting engineering services via a Request for Qualifications (RFQ) to implement approved FY 2026 Community Development Block Grant (CDBG) projects. The selected engineering firm will handle project management tasks including plans and specifications, bid document distribution, assisting at bid openings, contract execution, pre-construction conferences, and construction inspections with periodic reporting. Proposals must be hand-delivered to the Town Clerk by 12:00 PM on December 22, 2025, with evaluation based on Qualifications (40 pts), Experience (40 pts), and Capacity for Performance (20 pts).
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
The Town of Sardis, Mississippi is soliciting engineering services via a Request for Qualifications (RFQ) to implement approved FY 2026 Community Development Block Grant (CDBG) projects. The selected engineering firm will handle project management tasks including plans and specifications, bid document distribution, assisting at bid openings, contract execution, pre-construction conferences, and construction inspections with periodic reporting. Proposals must be hand-delivered to the Town Clerk by 12:00 PM on December 22, 2025, with evaluation based on Qualifications (40 pts), Experience (40 pts), and Capacity for Performance (20 pts).
AvailableInfield renovation of two (2) ball fields - remove all existing bases, plates, rubbers, and plugs; identify all pre-existing grades and conditions; consider the area of work to be all clay playing surfaces and extending 15' beyond the infield clay into the outfield grass area to regrade the lip and reestablish an accurate grass arch; undercut existing playing surface and 15' into outfield grass and dispose of unnecessary materials to account for 4" imported engineered infield clay; laser grade existing playing surface material and 15' into outfield grass to shed water to the low point on each field before placing overseeded 419 Bermuda sod and 4" imported engineered infield clay; laser grade 4" imported engineered infield clay, compact upon approval and completion; install overseeded 419 Bermuda sod in a 15' lip arch and establish proper arch dimension and shape, using large rolls, machine laid, no pallet squares or mini rolls will be accepted; install Dura Edge ProLoc Mound Blocks in batter’s boxes and catcher’s box should be 4" deep (each batter's box is 7'x3' and catcher’s box is 5'x5'). Leave extra blocks for later repairs; install 60' (on both fields), 70' (on both fields), and 80' (on C & H Field only) base plugs and new home plates; include irrigation repair budget to modify head placement and height as necessary, as grade changes through the process. Irrigation budget will be a lump sum on an as-needed basis; set up the Irrigation run schedule and ensure its proper function to establish new sod before the Spring sports season; repair any field damage caused by your company during the renovations.
Posted Date
-
Due Date
Jan 7, 2026
Release: -
Close: Jan 7, 2026
Infield renovation of two (2) ball fields - remove all existing bases, plates, rubbers, and plugs; identify all pre-existing grades and conditions; consider the area of work to be all clay playing surfaces and extending 15' beyond the infield clay into the outfield grass area to regrade the lip and reestablish an accurate grass arch; undercut existing playing surface and 15' into outfield grass and dispose of unnecessary materials to account for 4" imported engineered infield clay; laser grade existing playing surface material and 15' into outfield grass to shed water to the low point on each field before placing overseeded 419 Bermuda sod and 4" imported engineered infield clay; laser grade 4" imported engineered infield clay, compact upon approval and completion; install overseeded 419 Bermuda sod in a 15' lip arch and establish proper arch dimension and shape, using large rolls, machine laid, no pallet squares or mini rolls will be accepted; install Dura Edge ProLoc Mound Blocks in batter’s boxes and catcher’s box should be 4" deep (each batter's box is 7'x3' and catcher’s box is 5'x5'). Leave extra blocks for later repairs; install 60' (on both fields), 70' (on both fields), and 80' (on C & H Field only) base plugs and new home plates; include irrigation repair budget to modify head placement and height as necessary, as grade changes through the process. Irrigation budget will be a lump sum on an as-needed basis; set up the Irrigation run schedule and ensure its proper function to establish new sod before the Spring sports season; repair any field damage caused by your company during the renovations.
AvailableThe project consists of complete preparation and installation of the infield playing surface, including grading, base material placement, soil conditioning, and the application of infield mix. Work shall also include installation of pitcher's mound, home plate area, bases, and transition areas.
Posted Date
Dec 3, 2025
Due Date
Dec 19, 2025
Release: Dec 3, 2025
Close: Dec 19, 2025
The project consists of complete preparation and installation of the infield playing surface, including grading, base material placement, soil conditioning, and the application of infield mix. Work shall also include installation of pitcher's mound, home plate area, bases, and transition areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis