Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacing four (4) aluminum panel sign cabinets with internally illuminated push-through lettering. The existing cabinets will be removed and replaced with new ones conforming to current parks standards. Use of existing sign infrastructure is required. The existing led lights inside the cabinets will also be replaced. A total of four (4), double-sided, sign cabinets are required. Two of the cabinets are 14'-9" x 6'-3" and two are 7'-9" x 6'-3".
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Highway sign replacement.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Highway sign replacement.
AvailableThis project involves the replacement of an existing shower house and laundry facility with a new design shower house including 8 showers, 6 restrooms, and a laundry at Wakonda State Park. The new structure will feature reinforced concrete block walls and a wood-framed roof with asphalt shingles.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
This project involves the replacement of an existing shower house and laundry facility with a new design shower house including 8 showers, 6 restrooms, and a laundry at Wakonda State Park. The new structure will feature reinforced concrete block walls and a wood-framed roof with asphalt shingles.
AvailableMonument sign display panel replacement.
Posted Date
Dec 16, 2025
Due Date
Jan 30, 2026
Release: Dec 16, 2025
Close: Jan 30, 2026
Monument sign display panel replacement.
AvailableThis project will consist of the removal and disposal of concrete and rock masonry portal sign bases in clear zones, the removal and disposal of existing wood portal signs, construction of new portal sign bases, and installation of government-furnished signs.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
This project will consist of the removal and disposal of concrete and rock masonry portal sign bases in clear zones, the removal and disposal of existing wood portal signs, construction of new portal sign bases, and installation of government-furnished signs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis