Summary
Work inlcudes consists of mobilization and demobilization; implementing best management practices (bmp); staking and survey monument restoration; traffic control plan preparation and implementation; public notifications; clearing and grubbing, utility company coordination and utility verification; removal of existing roadway improvements, subgrade preparation, cold milling of existing asphalt; construction of asphalt concrete (ac) pavement, asphalt rubberized hot mix (arhm) pavement, full depth pavement section repairs, concrete patches, pcc curb ramps, pcc sidewalk, pcc curb and gutter, pcc curb, pcc cross gutters.