Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a stand alone 6,848 SF building and all associated site work; building is a steel post and beam frame with steel stud curtain wall, roof system will utilize both metal decking on steel bar joists and wood decking on glulam beams and wood joists; roofing will be both a tpo membrane and standing seam metal roofing; HVAC system include packaged combo rooftop units and mini split system. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The General Services Administration (GSA), Public Buildings Service (PBS) is holding a virtual Industry Day to describe two complex construction projects at the Federico Degetau Federal Building and Clemente Ruiz Nazario U.S. Courthouse Complex in San Juan, Puerto Rico: (1) non-structural seismic mitigation at the Nazario Courthouse and (2) a new 10-story courthouse annex. The notice provides project scopes, estimated magnitudes ($20M–$40M for seismic mitigation; $200M–$260M for the annex), contract type (firm-fixed-price), and procurement approach (FAR Part 15/36). It is an informational Special Notice (industry day only), not a solicitation for proposals; registration is required for the virtual event and no primary solicitation attachment is posted.
Posted Date
Nov 20, 2025
Due Date
Jan 14, 2026
Premium
Access the largest public sector contact database
Close: Jan 14, 2026
The General Services Administration (GSA), Public Buildings Service (PBS) is holding a virtual Industry Day to describe two complex construction projects at the Federico Degetau Federal Building and Clemente Ruiz Nazario U.S. Courthouse Complex in San Juan, Puerto Rico: (1) non-structural seismic mitigation at the Nazario Courthouse and (2) a new 10-story courthouse annex. The notice provides project scopes, estimated magnitudes ($20M–$40M for seismic mitigation; $200M–$260M for the annex), contract type (firm-fixed-price), and procurement approach (FAR Part 15/36). It is an informational Special Notice (industry day only), not a solicitation for proposals; registration is required for the virtual event and no primary solicitation attachment is posted.
AvailableFeeder 2402 relay panel.
Posted Date
Nov 28, 2025
Due Date
Dec 16, 2025
Release: Nov 28, 2025
Close: Dec 16, 2025
Feeder 2402 relay panel.
AvailableThe Texas Department of Criminal Justice (TDCJ) is soliciting bids to supply, deliver and install a complete water softening system and related infrastructure at the San Saba Unit. Scope includes ordering and installing the softener equipment, constructing a new insulated metal building on concrete pads, installing new piping and electrical work, relocating gutters to a French drain, and performing startup per manufacturer recommendations. The solicitation’s period of performance begins upon award and (per the posting) must be completed by March 24, 2025.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The Texas Department of Criminal Justice (TDCJ) is soliciting bids to supply, deliver and install a complete water softening system and related infrastructure at the San Saba Unit. Scope includes ordering and installing the softener equipment, constructing a new insulated metal building on concrete pads, installing new piping and electrical work, relocating gutters to a French drain, and performing startup per manufacturer recommendations. The solicitation’s period of performance begins upon award and (per the posting) must be completed by March 24, 2025.
AvailableReplace water damaged gypsum wallboard in (2) offices, batt wall insulation replacement, replace damaged ceiling tiles, replace windows, new texture, painting and new wall base of the Omak TANF building.
Posted Date
Nov 25, 2025
Due Date
Jan 7, 2026
Release: Nov 25, 2025
Close: Jan 7, 2026
Replace water damaged gypsum wallboard in (2) offices, batt wall insulation replacement, replace damaged ceiling tiles, replace windows, new texture, painting and new wall base of the Omak TANF building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis