Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for proposals for the construction of a new boat ramp at Sallisaw Creek.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Cherokee Nation Cultural and Economic Development (CED) is soliciting sealed proposals from qualified contractors for construction of a new boat ramp at Sallisaw Creek as part of the Cherokee Nation Park Project. Work includes site preparation, earthwork, concrete construction, shoreline and access improvements, erosion and sediment control, and site restoration; the project duration is 90 calendar days.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Close: Dec 12, 2025
The Cherokee Nation Cultural and Economic Development (CED) is soliciting sealed proposals from qualified contractors for construction of a new boat ramp at Sallisaw Creek as part of the Cherokee Nation Park Project. Work includes site preparation, earthwork, concrete construction, shoreline and access improvements, erosion and sediment control, and site restoration; the project duration is 90 calendar days.
Premium
Access the largest public sector contact database
1. Site preparation. perform detailed site assessment and layout verification. mobilize personnel, equipment, and materials to the project site 2. Earthwork. conduct excavation, grading, and subgrade preparation per design elevations 3. Concrete construction. install formwork and reinforcement. place and finish reinforced concrete for the boat ramp structure 4. Shoreline and access improvements. construct pedestrian and vehicle access pathways. provide shoreline stabilization (e. G. , riprap placement or equivalent measures) 5. Erosion and sediment control. implement and maintain best management practices (bmps) throughout construction 6. Site restoration. perform final grading, site cleanup, and restoration to preconstruction condition or better.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Close: Dec 12, 2025
1. Site preparation. perform detailed site assessment and layout verification. mobilize personnel, equipment, and materials to the project site 2. Earthwork. conduct excavation, grading, and subgrade preparation per design elevations 3. Concrete construction. install formwork and reinforcement. place and finish reinforced concrete for the boat ramp structure 4. Shoreline and access improvements. construct pedestrian and vehicle access pathways. provide shoreline stabilization (e. G. , riprap placement or equivalent measures) 5. Erosion and sediment control. implement and maintain best management practices (bmps) throughout construction 6. Site restoration. perform final grading, site cleanup, and restoration to preconstruction condition or better.
Provide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
Posted Date
Nov 25, 2025
Due Date
Jan 6, 2026
Release: Nov 25, 2025
Close: Jan 6, 2026
Provide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
AvailableCounty natural resources division administers a new installation and replacement boat ramp program for boating access in county lakes. Typically, the county installs or replaces two ramps annually via this program. The boat ramp system that best suits our program contains the following: utilizes solid reinforced concrete slabs and footers designed to accommodate medium sized construction equipment over the full length of the ramp for future maintenance. The concrete slabs and footers should be designed to support boat launching and maintenance independent of existing soil conditions and erosion/scouring which is typically associated with boat power loading. The system should be adaptable to any site conditions/facility design configuration. No dewatering, coffer dams or well points should be required for installation of the system. The system must include all design/engineering to meet permitting requirements.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
County natural resources division administers a new installation and replacement boat ramp program for boating access in county lakes. Typically, the county installs or replaces two ramps annually via this program. The boat ramp system that best suits our program contains the following: utilizes solid reinforced concrete slabs and footers designed to accommodate medium sized construction equipment over the full length of the ramp for future maintenance. The concrete slabs and footers should be designed to support boat launching and maintenance independent of existing soil conditions and erosion/scouring which is typically associated with boat power loading. The system should be adaptable to any site conditions/facility design configuration. No dewatering, coffer dams or well points should be required for installation of the system. The system must include all design/engineering to meet permitting requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis