Work includes 2,041 SY removing concrete sidewalk, 154 SY removing concrete driveway, 2 SY removing concrete steps, 19 LF removing pipe, 2,518 LF removing curb and gutter, 86 LF removing retaining wall, removing inlets, removing junction boxes, 4 EA removing inlets (partial), 150 CY unclassified excavation, 50 CY borrow excavation (loose truckbed measurement), 36 CY structure excavation, 14 CY foundation backfill, commercial, 289 CY selected materials, section 820, for miscellaneous use, 250 ton crushed aggregate, section 825, for miscellaneous use, 1,544 gal tack coat, 10,414 SY planing existing pavement (approx 1.10" thru 2.0" thick). See attached file.