Summary
Work includes 4 EA portable changeable message signs; 2,756 SY remove full depth asphalt concrete (ac) pavement; 152 SY remove full depth concrete (pcc) pavement; 100 SY remove existing median (full removal); 1 LS miscellaneous removals; 2 EA removal of pavement marking; 2,739 SY subgrade preparation - scarify and recompact 12 inch; 5,855 tn aggregate base; 945 ton asphalt concrete (type a); 8,086 SF PCC concrete pavement; 20 ton micro-surfacing; 1,813 LF PCC curb (caltrans a1-6); 3,289 SF 6" PCC median; 114 EA install new bollard; 65 LF special delineators; 2,508 LF 6" white stripe (thermoplastic). See outside link.