Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 288 ton contaminated soil disposal, 3,200 LF concrete sawcutting 4" deep, 41 LF 12" storm sewer pipe 5FT depth, 5,461 SF extra for pavement repair, 17,963 SF concrete walks, traffic signal modification.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 337 LF removal of pipes, 6,745 LF asphalt pavement sawcutting 8" deep, 617 LF mainline video inspection, 445 LF mainline video with laser profile inspection, 302 LF 12" storm sewer pipe 5FT depth, 20 LF 3" PVC pipe 5 FT depth, 42 LF 8" ductile iron pipe 5 FT depth, 575 LF 12" ductile iron pipe 5 FT depth, 11 EA concrete storm sewer manholes.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Premium
Access the largest public sector contact database
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 337 LF removal of pipes, 6,745 LF asphalt pavement sawcutting 8" deep, 617 LF mainline video inspection, 445 LF mainline video with laser profile inspection, 302 LF 12" storm sewer pipe 5FT depth, 20 LF 3" PVC pipe 5 FT depth, 42 LF 8" ductile iron pipe 5 FT depth, 575 LF 12" ductile iron pipe 5 FT depth, 11 EA concrete storm sewer manholes.
The City of Glendora issued a solicitation for a CDBG-funded curb ramps improvements project involving mobilization, traffic control, removal of existing concrete improvements, construction of curb ramps to SPPWC standards, installation of ADA-compliant truncated domes, and replacement/grinding of sidewalks per City of Glendora SD&S 1.02. The estimated contract value range is $50,000 - $250,000 (AI estimate). Bids are currently open with a response deadline in early January 2026. The original posting is linked from the HigherGov listing and points to a QuestCDN posting hosted by the City.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
The City of Glendora issued a solicitation for a CDBG-funded curb ramps improvements project involving mobilization, traffic control, removal of existing concrete improvements, construction of curb ramps to SPPWC standards, installation of ADA-compliant truncated domes, and replacement/grinding of sidewalks per City of Glendora SD&S 1.02. The estimated contract value range is $50,000 - $250,000 (AI estimate). Bids are currently open with a response deadline in early January 2026. The original posting is linked from the HigherGov listing and points to a QuestCDN posting hosted by the City.
AvailableThe City of Glendora issued a solicitation for a CDBG-funded curb ramps improvements project involving mobilization, traffic control, removal of existing concrete improvements, construction of curb ramps to SPPWC standards, installation of ADA-compliant truncated domes, and replacement/grinding of sidewalks per City of Glendora SD&S 1.02. The estimated contract value range is $50,000 - $250,000 (AI estimate). Bids are currently open with a response deadline in early January 2026. The original posting is linked from the HigherGov listing and points to a QuestCDN posting hosted by the City.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
The City of Glendora issued a solicitation for a CDBG-funded curb ramps improvements project involving mobilization, traffic control, removal of existing concrete improvements, construction of curb ramps to SPPWC standards, installation of ADA-compliant truncated domes, and replacement/grinding of sidewalks per City of Glendora SD&S 1.02. The estimated contract value range is $50,000 - $250,000 (AI estimate). Bids are currently open with a response deadline in early January 2026. The original posting is linked from the HigherGov listing and points to a QuestCDN posting hosted by the City.
AvailableThe City of Long Beach Public Works Department is soliciting contractors for R-7216 Curb Ramps and Related Improvements to construct, repair, and replace Portland cement curb ramps, sidewalks, driveways, curbs, gutters, retaining walls, and related pavement, plus associated excavation, grading, pruning, and tree removal. The solicitation is an open construction contract with an estimated value range of $500,000 - $2,000,000 and a response deadline on January 8, 2026 at 10:00 AM PST.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
The City of Long Beach Public Works Department is soliciting contractors for R-7216 Curb Ramps and Related Improvements to construct, repair, and replace Portland cement curb ramps, sidewalks, driveways, curbs, gutters, retaining walls, and related pavement, plus associated excavation, grading, pruning, and tree removal. The solicitation is an open construction contract with an estimated value range of $500,000 - $2,000,000 and a response deadline on January 8, 2026 at 10:00 AM PST.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis