Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oregon Department of Transportation
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 337 LF removal of pipes, 6,745 LF asphalt pavement sawcutting 8" deep, 617 LF mainline video inspection, 445 LF mainline video with laser profile inspection, 302 LF 12" storm sewer pipe 5FT depth, 20 LF 3" PVC pipe 5 FT depth, 42 LF 8" ductile iron pipe 5 FT depth, 575 LF 12" ductile iron pipe 5 FT depth, 11 EA concrete storm sewer manholes.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Oregon Department of Transportation
Work consists of repair a damaged section of concrete bridge rail. Includes 1 LS Temporary Work Zone Traffic Control, Complete; 1 LS Bridge Removal Work; 1 LS Locate Concrete Repair; 29 SF Concrete Repair; 1 LS General Structural Concrete, Class 3300.
Posted Date
Nov 20, 2025
Due Date
Dec 4, 2025
Release: Nov 20, 2025
Oregon Department of Transportation
Close: Dec 4, 2025
Work consists of repair a damaged section of concrete bridge rail. Includes 1 LS Temporary Work Zone Traffic Control, Complete; 1 LS Bridge Removal Work; 1 LS Locate Concrete Repair; 29 SF Concrete Repair; 1 LS General Structural Concrete, Class 3300.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Bloomington
This project shall include, but is not limited to, the construction of curb ramps, curbs and sidewalks at five intersections along east 2nd St. The installation of a new storm inlet, and pipe is included in this project.
Posted Date
Nov 2, 2025
Due Date
Dec 1, 2025
Release: Nov 2, 2025
City of Bloomington
Close: Dec 1, 2025
This project shall include, but is not limited to, the construction of curb ramps, curbs and sidewalks at five intersections along east 2nd St. The installation of a new storm inlet, and pipe is included in this project.
AvailableCalifornia Department of Transportation
Full depth recycling, cold plane, HMA and curb ramps.
Posted Date
Oct 6, 2025
Due Date
Dec 2, 2025
Release: Oct 6, 2025
California Department of Transportation
Close: Dec 2, 2025
Full depth recycling, cold plane, HMA and curb ramps.
AvailableCity of Huntington Beach
Provide ADA ramps on residential street corners.
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
City of Huntington Beach
Close: Dec 15, 2025
Provide ADA ramps on residential street corners.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →