Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oregon Department of Transportation
Work consists of repair a damaged section of concrete bridge rail. Includes 1 LS Temporary Work Zone Traffic Control, Complete; 1 LS Bridge Removal Work; 1 LS Locate Concrete Repair; 29 SF Concrete Repair; 1 LS General Structural Concrete, Class 3300.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Fort Worth
Work includes repair and replacement of bridge handrail, guardrail, and attenuators. Also includes 10 CY of remove concrete (mowstrip); 50 LF of remove concrete (rail); 10 CY of 4" riprap (mow strip); 50 LF of rail (ty T1F); 200 LF of metal W-beam guard fence (tim post); see attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
City of Fort Worth
Close: Dec 11, 2025
Work includes repair and replacement of bridge handrail, guardrail, and attenuators. Also includes 10 CY of remove concrete (mowstrip); 50 LF of remove concrete (rail); 10 CY of 4" riprap (mow strip); 50 LF of rail (ty T1F); 200 LF of metal W-beam guard fence (tim post); see attached files.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oconto County
Oconto County is soliciting proposals to remove the existing rail truss bridge and install a new clear‑span recreational bridge over the Little River in the Town of Stiles. Proposals must be submitted via DemandStar or delivered to the Oconto County Forest & Parks Department by the deadline.
Posted Date
Nov 19, 2025
Due Date
Jan 5, 2026
Release: Nov 19, 2025
Oconto County
Close: Jan 5, 2026
Oconto County is soliciting proposals to remove the existing rail truss bridge and install a new clear‑span recreational bridge over the Little River in the Town of Stiles. Proposals must be submitted via DemandStar or delivered to the Oconto County Forest & Parks Department by the deadline.
AvailableTown of Marshfield
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Town of Marshfield
Close: Dec 19, 2025
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
AvailableOregon Department of Transportation
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 337 LF removal of pipes, 6,745 LF asphalt pavement sawcutting 8" deep, 617 LF mainline video inspection, 445 LF mainline video with laser profile inspection, 302 LF 12" storm sewer pipe 5FT depth, 20 LF 3" PVC pipe 5 FT depth, 42 LF 8" ductile iron pipe 5 FT depth, 575 LF 12" ductile iron pipe 5 FT depth, 11 EA concrete storm sewer manholes.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Oregon Department of Transportation
Close: Dec 18, 2025
Grading, drainage, paving, curb ramps, signing, signals & roadside development includes 337 LF removal of pipes, 6,745 LF asphalt pavement sawcutting 8" deep, 617 LF mainline video inspection, 445 LF mainline video with laser profile inspection, 302 LF 12" storm sewer pipe 5FT depth, 20 LF 3" PVC pipe 5 FT depth, 42 LF 8" ductile iron pipe 5 FT depth, 575 LF 12" ductile iron pipe 5 FT depth, 11 EA concrete storm sewer manholes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →