City of Huntington Beach
Provide ADA ramps on residential street corners.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Riverside
Project proposes to remove and replace broken concrete curb, gutter, sidewalk and ADA ramps at various locations throughout the city. The project also includes construction of new concrete driveways and sidewalk.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
City of Riverside
Close: Dec 4, 2025
Project proposes to remove and replace broken concrete curb, gutter, sidewalk and ADA ramps at various locations throughout the city. The project also includes construction of new concrete driveways and sidewalk.
AvailableCounty of San Bernardino
ADA ramps and storm drain installation. The work, in general, consists of constructing sidewalk, curb and gutter, spandrel, cross gutter, upgrading non-ADA compliant ramps, installing storm drain structures and doing other work appurtenant thereto.
Posted Date
Oct 9, 2025
Due Date
Nov 20, 2025
Release: Oct 9, 2025
County of San Bernardino
Close: Nov 20, 2025
ADA ramps and storm drain installation. The work, in general, consists of constructing sidewalk, curb and gutter, spandrel, cross gutter, upgrading non-ADA compliant ramps, installing storm drain structures and doing other work appurtenant thereto.
AvailableCalifornia Department of Transportation
Work consists of drainage restoration, ADA curb ramps & complete street, includes, 19,000 LF of temporary traffic stripe (paint); 910 LF of temporary check dam; 350 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 780 SF of remove yellow thermoplastic pavement marking (hazardous waste); 1,500 LF of temporary arroyo toad fence; 3,200 LF of temporary protection fence (rope); 2,120 CY of roadway excavation; 4,020 TON of hot mix asphalt (type a); 2,630 TON of rubberized hot mix asphalt (gap graded); 4,000 LF of place hot mix asphalt dike (type d); 27,000 SY of cold plane asphalt concrete pavement; 450 LF of 18" reinforced concrete pipe; 90 LF of 30" reinforced concrete pipe trenchless installation method; 820 LF of cleaning, inspecting, and preparing culvert; 260 SF of furnish single sheet aluminum sign; 3,700 SF of thermoplastic pavement marking; 32,600 LF of 6" thermoplastic traffic stripe; 2,250 SF of remove thermoplastic pavement marking. See attached files.
Posted Date
Oct 13, 2025
Due Date
Dec 2, 2025
Release: Oct 13, 2025
California Department of Transportation
Close: Dec 2, 2025
Work consists of drainage restoration, ADA curb ramps & complete street, includes, 19,000 LF of temporary traffic stripe (paint); 910 LF of temporary check dam; 350 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 780 SF of remove yellow thermoplastic pavement marking (hazardous waste); 1,500 LF of temporary arroyo toad fence; 3,200 LF of temporary protection fence (rope); 2,120 CY of roadway excavation; 4,020 TON of hot mix asphalt (type a); 2,630 TON of rubberized hot mix asphalt (gap graded); 4,000 LF of place hot mix asphalt dike (type d); 27,000 SY of cold plane asphalt concrete pavement; 450 LF of 18" reinforced concrete pipe; 90 LF of 30" reinforced concrete pipe trenchless installation method; 820 LF of cleaning, inspecting, and preparing culvert; 260 SF of furnish single sheet aluminum sign; 3,700 SF of thermoplastic pavement marking; 32,600 LF of 6" thermoplastic traffic stripe; 2,250 SF of remove thermoplastic pavement marking. See attached files.
AvailableCity of Bloomington
This project shall include, but is not limited to, the construction of curb ramps, curbs and sidewalks at five intersections along east 2nd St. The installation of a new storm inlet, and pipe is included in this project.
Posted Date
Nov 2, 2025
Due Date
Dec 1, 2025
Release: Nov 2, 2025
City of Bloomington
Close: Dec 1, 2025
This project shall include, but is not limited to, the construction of curb ramps, curbs and sidewalks at five intersections along east 2nd St. The installation of a new storm inlet, and pipe is included in this project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis