Retrieving RFP details
Release
Close
California Department of Transportation
Work consists of drainage restoration, ADA curb ramps & complete street, includes, 19,000 LF of temporary traffic stripe (paint); 910 LF of temporary check dam; 350 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 780 SF of remove yellow thermoplastic pavement marking (hazardous waste); 1,500 LF of temporary arroyo toad fence; 3,200 LF of temporary protection fence (rope); 2,120 CY of roadway excavation; 4,020 TON of hot mix asphalt (type a); 2,630 TON of rubberized hot mix asphalt (gap graded); 4,000 LF of place hot mix asphalt dike (type d); 27,000 SY of cold plane asphalt concrete pavement; 450 LF of 18" reinforced concrete pipe; 90 LF of 30" reinforced concrete pipe trenchless installation method; 820 LF of cleaning, inspecting, and preparing culvert; 260 SF of furnish single sheet aluminum sign; 3,700 SF of thermoplastic pavement marking; 32,600 LF of 6" thermoplastic traffic stripe; 2,250 SF of remove thermoplastic pavement marking. See attached files.
Drainage Restoration, ADA Curb Ramps & Complete Street
zip
California Department of Transportation
Culvert restoration, install curb ramps, guardrail, & HMA-A
City of Pomona
Citywide ADA curb ramps and path work.
City of Duarte
This project requires the awarded contractor to construct new ADA ramps. The work includes removal and disposal of existing architectural barriers including but not limited the removal of concrete sidewalks, curb and gutter, existing non-compliant ramp if applicable, and adjusting to grade or relocation of utility vaults and signposts. It also includes minor grading of area where needed to accommodate the installation of a new PCC ADA compliant ramp done in accordance with the requirements of the Standard Specifications for Public Works Construction.
Release
Oct 13, 2025
Close
Dec 02, 2025