Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Water line extension.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Pineville, West Virginia is soliciting bids for the Brenton/Baileysville/Doublecamp Branch Road Water Line Extension. The project includes approximately 39,000 LF of 8-inch water line, a 172,000-gallon water storage tank, and related appurtenances with a mandatory pre-bid on January 29, 2026 at 11:00 AM. Bids are due February 26, 2026 at 2:00 PM local time at 75 Main Avenue, Pineville, WV 24874.
Posted Date
Jan 7, 2026
Due Date
Feb 26, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Pineville, West Virginia is soliciting bids for the Brenton/Baileysville/Doublecamp Branch Road Water Line Extension. The project includes approximately 39,000 LF of 8-inch water line, a 172,000-gallon water storage tank, and related appurtenances with a mandatory pre-bid on January 29, 2026 at 11:00 AM. Bids are due February 26, 2026 at 2:00 PM local time at 75 Main Avenue, Pineville, WV 24874.
AvailableConstruction of sand and gravel road water main extension including the installation of approx. 2,400 LF of 4" PVC water main and all related appurtenances.
Posted Date
Jan 21, 2026
Due Date
Feb 9, 2026
Release: Jan 21, 2026
Close: Feb 9, 2026
Construction of sand and gravel road water main extension including the installation of approx. 2,400 LF of 4" PVC water main and all related appurtenances.
AvailableWork include 45 LF 8" dip cl 50; 1,270 LF 8" dip cl 50 restraint jt; 290 LF 8" dip cl 50 w/nitrile gskt; 60 LF 8" dip cl 50 b&s jt; 36,766 LF pipeline cleaning; 36,766 LF pipeline disinfection; 48 EA 8" valve; 19 EA 8" connection fire hyd; 1,325 LF 10" directional drill stream crossing; 25 LF 2" trenchless stream crossing; 8,000 SY asphalt milling; 160 LF curb and gutter replacement; 212 EA 3/4" connection; 3,650 LF 3/4" add service line; 155 LF 1" sl creek crossing; 224 EA meter set. See outside link for more.
Posted Date
Jan 6, 2026
Due Date
Feb 26, 2026
Release: Jan 6, 2026
Close: Feb 26, 2026
Work include 45 LF 8" dip cl 50; 1,270 LF 8" dip cl 50 restraint jt; 290 LF 8" dip cl 50 w/nitrile gskt; 60 LF 8" dip cl 50 b&s jt; 36,766 LF pipeline cleaning; 36,766 LF pipeline disinfection; 48 EA 8" valve; 19 EA 8" connection fire hyd; 1,325 LF 10" directional drill stream crossing; 25 LF 2" trenchless stream crossing; 8,000 SY asphalt milling; 160 LF curb and gutter replacement; 212 EA 3/4" connection; 3,650 LF 3/4" add service line; 155 LF 1" sl creek crossing; 224 EA meter set. See outside link for more.
AvailableThe Town of Ayer DPW is soliciting sealed bids for the Bishop Road Water Main Extension project. Work includes installing a new 8‑inch water main with appurtenances, hydrant assemblies, service connections, connections to intersecting streets, and drainage infrastructure; an additive alternate includes communication conduit and the project includes horizontal directional drilling. Bids are due at the Ayer DPW building, and the contract time is 150 calendar days after Notice to Proceed under M.G.L. c.30 §39M.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
The Town of Ayer DPW is soliciting sealed bids for the Bishop Road Water Main Extension project. Work includes installing a new 8‑inch water main with appurtenances, hydrant assemblies, service connections, connections to intersecting streets, and drainage infrastructure; an additive alternate includes communication conduit and the project includes horizontal directional drilling. Bids are due at the Ayer DPW building, and the contract time is 150 calendar days after Notice to Proceed under M.G.L. c.30 §39M.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →