Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project involves sewer lagoon improvements, including replacement of Cell 4, installation of a bypass piping and manhole system for lagoon maintenance, and replacement of all level control gates. Additionally, an RV dump/fill station will be constructed with site preparation, asphalt paving, utility connections, kiosks, lighting, water spigots, and sewer cleanouts for four separate stations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project involves sewer lagoon improvements, including replacement of Cell 4, installation of a bypass piping and manhole system for lagoon maintenance, and replacement of all level control gates. Additionally, an RV dump/fill station will be constructed with site preparation, asphalt paving, utility connections, kiosks, lighting, water spigots, and sewer cleanouts for four separate stations.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
The project involves sewer lagoon improvements, including replacement of Cell 4, installation of a bypass piping and manhole system for lagoon maintenance, and replacement of all level control gates. Additionally, an RV dump/fill station will be constructed with site preparation, asphalt paving, utility connections, kiosks, lighting, water spigots, and sewer cleanouts for four separate stations.
Premium
Access the largest public sector contact database
Furnishing and installation of a new Pre-Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Furnishing and installation of a new Pre-Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station.
AvailablePurchase of the following described equipment on the basis of cash payment for the equipment. "Eagle Safe Station X2" self-contained breathing apparatus (SCBA) 2 bottle fill station. Unit is in average used condition and is working. There is NO serial number or identifi‐ cation plate.
Posted Date
Dec 12, 2025
Due Date
Dec 23, 2025
Release: Dec 12, 2025
Close: Dec 23, 2025
Purchase of the following described equipment on the basis of cash payment for the equipment. "Eagle Safe Station X2" self-contained breathing apparatus (SCBA) 2 bottle fill station. Unit is in average used condition and is working. There is NO serial number or identifi‐ cation plate.
AvailableThe Town of Walpole is soliciting contractors to replace two existing earthen lagoons with two new cast-in-place reinforced concrete lagoons, including temporary piping systems, residual management, selective demolition, clearing, replacement of fencing, exterior piping, fittings, valves, hydrants, manholes, flow metering equipment, site improvements, and surface restorations. A non-mandatory pre-bid site visit is scheduled for December 18, 2025 at 1:00 PM at the H.E. Willis Water Treatment Facility site.
Posted Date
Dec 3, 2025
Due Date
Dec 30, 2025
Release: Dec 3, 2025
Close: Dec 30, 2025
The Town of Walpole is soliciting contractors to replace two existing earthen lagoons with two new cast-in-place reinforced concrete lagoons, including temporary piping systems, residual management, selective demolition, clearing, replacement of fencing, exterior piping, fittings, valves, hydrants, manholes, flow metering equipment, site improvements, and surface restorations. A non-mandatory pre-bid site visit is scheduled for December 18, 2025 at 1:00 PM at the H.E. Willis Water Treatment Facility site.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.