Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design/Build-Furnish materials, labor, and equipment necessary to design/build office and maintenance of way facilities. Project work tasks shall include, but not be limited to, site development, utility hook-ups, building design and construction to modify RJCC main office building and associated components, building design/demolition and construction of new maintenance of way building, mechanical, electrical, plumbing, utility installation and relocation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
DESIGN/BUILD: services for the aviation maintenance facility project. Design-build shall provide complete design, engineering, estimating, scheduling, construction management and energy efficiency services.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
DESIGN/BUILD: services for the aviation maintenance facility project. Design-build shall provide complete design, engineering, estimating, scheduling, construction management and energy efficiency services.
AvailableDesign-build services for west side yard flood mitigation measures.
Posted Date
Sep 30, 2023
Due Date
Feb 5, 2026
Release: Sep 30, 2023
Close: Feb 5, 2026
Design-build services for west side yard flood mitigation measures.
AvailableTo provide professional design/build services to include professional design and engineering services for the preparation of construction documents, obtaining permits and construction of the Yard to be located at 389 Burns Crossing Road in Severn, MD to the south of the Millersville Landfill and Resource Recovery Facility.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
To provide professional design/build services to include professional design and engineering services for the preparation of construction documents, obtaining permits and construction of the Yard to be located at 389 Burns Crossing Road in Severn, MD to the south of the Millersville Landfill and Resource Recovery Facility.
AvailablePlacer County Water Agency (PCWA) is soliciting statements of qualifications and pricing proposals for a Progressive Design-Build project to design and construct improvements to the Foothill Water Treatment Plant and other water treatment facilities. The project will be delivered in multiple phases using a progressive design-build approach and includes preparing preliminary design reports, identifying priority improvements, coordinating plant outages, and delivering an initial subset of work with combined design and construction cost of at least $5 million. Contact information and full solicitation documents are posted on the buyer's official posting on PublicPurchase (link provided), but documents on PublicPurchase require vendor access to download.
Posted Date
Nov 24, 2025
Due Date
Feb 10, 2026
Release: Nov 24, 2025
Close: Feb 10, 2026
Placer County Water Agency (PCWA) is soliciting statements of qualifications and pricing proposals for a Progressive Design-Build project to design and construct improvements to the Foothill Water Treatment Plant and other water treatment facilities. The project will be delivered in multiple phases using a progressive design-build approach and includes preparing preliminary design reports, identifying priority improvements, coordinating plant outages, and delivering an initial subset of work with combined design and construction cost of at least $5 million. Contact information and full solicitation documents are posted on the buyer's official posting on PublicPurchase (link provided), but documents on PublicPurchase require vendor access to download.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis