Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include repair and adjustment of sewer manhole risers, frames, & covers as well as the adjustment of water gate valve boxes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish and deliver sanitary sewer and water manhole lids.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Furnish and deliver sanitary sewer and water manhole lids.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Poinsettia lane sewer improvements includes remove 2,560 feet of existing 12" diameter pvc sewer and replace with 910 feet of 15" diameter sewer and 1,650 feet of 18" pvc sewer; modification, rechanneling and rehabilitation of 10 existing sewer manhole structures; and all incidental work including, but not limited to, surveying services; utility potholing; groundwater dewatering and permitting; sewer by-pass systems; storm water and non-storm water pollution prevention; excavation support systems, including engineering services for deep excavations exceeding 20-feet in depth; traffic control; earthwork; paving and site restoration. Bressi sewer manhole rehabilitation includes rehabilitate 25 sewer manholes with epoxy-mortar lining inclusive of removing existing t-lock lining systems; interior surface preparation, smoothing, and cleaning; replacement of concrete benches and channels; removing, installing manhole concrete collars, frames and covers with adjustment to final grade; groundwater infiltration proofing by injection grouting; and all incidental work including, but not limited to, sewer by-pass systems and methods; and traffic control. Schedule also includes groundwater infiltration proofing by injection grouting at the poinsettia lift station flow meter vault.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Poinsettia lane sewer improvements includes remove 2,560 feet of existing 12" diameter pvc sewer and replace with 910 feet of 15" diameter sewer and 1,650 feet of 18" pvc sewer; modification, rechanneling and rehabilitation of 10 existing sewer manhole structures; and all incidental work including, but not limited to, surveying services; utility potholing; groundwater dewatering and permitting; sewer by-pass systems; storm water and non-storm water pollution prevention; excavation support systems, including engineering services for deep excavations exceeding 20-feet in depth; traffic control; earthwork; paving and site restoration. Bressi sewer manhole rehabilitation includes rehabilitate 25 sewer manholes with epoxy-mortar lining inclusive of removing existing t-lock lining systems; interior surface preparation, smoothing, and cleaning; replacement of concrete benches and channels; removing, installing manhole concrete collars, frames and covers with adjustment to final grade; groundwater infiltration proofing by injection grouting; and all incidental work including, but not limited to, sewer by-pass systems and methods; and traffic control. Schedule also includes groundwater infiltration proofing by injection grouting at the poinsettia lift station flow meter vault.
AvailablePoinsettia lane sewer improvements includes remove 2,560 feet of existing 12" diameter pvc sewer and replace with 910 feet of 15" diameter sewer and 1,650 feet of 18" pvc sewer; modification, rechanneling and rehabilitation of 10 existing sewer manhole structures; and all incidental work including, but not limited to, surveying services; utility potholing; groundwater dewatering and permitting; sewer by-pass systems; storm water and non-storm water pollution prevention; excavation support systems, including engineering services for deep excavations exceeding 20-feet in depth; traffic control; earthwork; paving and site restoration. Bressi sewer manhole rehabilitation includes rehabilitate 25 sewer manholes with epoxy-mortar lining inclusive of removing existing t-lock lining systems; interior surface preparation, smoothing, and cleaning; replacement of concrete benches and channels; removing, installing manhole concrete collars, frames and covers with adjustment to final grade; groundwater infiltration proofing by injection grouting; and all incidental work including, but not limited to, sewer by-pass systems and methods; and traffic control. Schedule also includes groundwater infiltration proofing by injection grouting at the poinsettia lift station flow meter vault.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Poinsettia lane sewer improvements includes remove 2,560 feet of existing 12" diameter pvc sewer and replace with 910 feet of 15" diameter sewer and 1,650 feet of 18" pvc sewer; modification, rechanneling and rehabilitation of 10 existing sewer manhole structures; and all incidental work including, but not limited to, surveying services; utility potholing; groundwater dewatering and permitting; sewer by-pass systems; storm water and non-storm water pollution prevention; excavation support systems, including engineering services for deep excavations exceeding 20-feet in depth; traffic control; earthwork; paving and site restoration. Bressi sewer manhole rehabilitation includes rehabilitate 25 sewer manholes with epoxy-mortar lining inclusive of removing existing t-lock lining systems; interior surface preparation, smoothing, and cleaning; replacement of concrete benches and channels; removing, installing manhole concrete collars, frames and covers with adjustment to final grade; groundwater infiltration proofing by injection grouting; and all incidental work including, but not limited to, sewer by-pass systems and methods; and traffic control. Schedule also includes groundwater infiltration proofing by injection grouting at the poinsettia lift station flow meter vault.
AvailableWork includes approx 1,120 LF of 8" PVC gravity sewer main; 1,200 LF of silt fence; 3 EA 4' sewer manhole. See attached file.
Posted Date
Jun 23, 2025
Due Date
Feb 5, 2026
Release: Jun 23, 2025
Close: Feb 5, 2026
Work includes approx 1,120 LF of 8" PVC gravity sewer main; 1,200 LF of silt fence; 3 EA 4' sewer manhole. See attached file.