Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes milling of existing mainline asphalt wearing surface to a depth of 2.5" and repaved with a 2.5" single course warm mix asphalt layer. Ramps shall be milled to a depth of 2" and repaved with a 2" single course warm mix asphalt layer. Epoxy striping with wet-night reflective elements will be used. Longitudinal and transverse joint repair of both eastbound and westbound lanes. Center cross-overs shall be milled and paved.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for pavement resurfacing services on Route I-87 in the towns of Clifton Park, Halfmoon, and Malta.
Posted Date
Feb 5, 2026
Due Date
Feb 5, 2026
Release: Feb 5, 2026
Close: Feb 5, 2026
This RFP is for pavement resurfacing services on Route I-87 in the towns of Clifton Park, Halfmoon, and Malta.
AvailablePavement Resurfacing.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Pavement Resurfacing.
AvailableProvide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for pavement resurfacing and mill/fill. See attached bid file.
Posted Date
Dec 23, 2025
Due Date
Jan 15, 2026
Release: Dec 23, 2025
Close: Jan 15, 2026
Provide construction inspection/material testing. The consultant will provide professional, technical, and other personnel, equipment, material, and all other things necessary for field inspection for pavement resurfacing and mill/fill. See attached bid file.
AvailableThis RFP is for pavement maintenance services for NY Route 28 in the Village of Cooperstown and Town of Otsego.
Posted Date
Feb 5, 2026
Due Date
Feb 5, 2026
Release: Feb 5, 2026
Close: Feb 5, 2026
This RFP is for pavement maintenance services for NY Route 28 in the Village of Cooperstown and Town of Otsego.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis