Summary
Work consist of 27 lf of 10" HPDE drainage pipe, 1 ea of catch basin, 890 sy of aggregate drive and parking area including geogrid, 890 sy of drive and parking area geogrid, 1 ea of 6x4x8 precast concrete culvert , 1,120 sf of concrete pads for 4 ada/ua parking spaces, striping and signage for ada/ua parking, 4 ea of recycled plastic wheel stop, 4,598 sf of 8' wide concrete walks, 242 sf of concrete bench pads, 2,480 sf of concrete plaza at pavilion, pavilion installation, 6 ea of picnic tables for pavilion, 9 ea of foundations for lighting poles, 9 ea of security and park lighting poles and fixtures install.