Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Standing Seam Metal Roofing Services for North County Distribution 1/Rainbow 11 Flow Control Facility.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Valve, flow control, NSN: 4820003464324LE, P/N: 45780-1.
Posted Date
Jul 28, 2021
Due Date
Jul 28, 2026
Release: Jul 28, 2021
Close: Jul 28, 2026
Valve, flow control, NSN: 4820003464324LE, P/N: 45780-1.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of relining an existing untreated water 96" inside dia. prestressed concrete cylinder pipe by fabricating, setting and welding approx. 4,968 LF of 93" outside dia. welded collapsible steel liners, and installing approx. 96 LF of 93" outside dia. cement mortar lined welded steel pipe closure pieces at two portals. This project will also include installation of an isolation facility for Pipeline 5 near the Oceanside 5 Flow Control Facility turnout, and rehabilitating eight pipeline structures which include removing, replacing, and salvaging existing valves and piping components.
Posted Date
Jan 26, 2026
Due Date
Feb 23, 2026
Release: Jan 26, 2026
Close: Feb 23, 2026
The project consists of relining an existing untreated water 96" inside dia. prestressed concrete cylinder pipe by fabricating, setting and welding approx. 4,968 LF of 93" outside dia. welded collapsible steel liners, and installing approx. 96 LF of 93" outside dia. cement mortar lined welded steel pipe closure pieces at two portals. This project will also include installation of an isolation facility for Pipeline 5 near the Oceanside 5 Flow Control Facility turnout, and rehabilitating eight pipeline structures which include removing, replacing, and salvaging existing valves and piping components.
Available77 ea, valve, flow control, NSN: 4810015308060.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
77 ea, valve, flow control, NSN: 4810015308060.
AvailableReplace roofing on building #17, Stewart Facility.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
Replace roofing on building #17, Stewart Facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →