Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Qualified, licensed, and insured roofing contractors for the application of a liquid-applied roof coating system to cover approx. 6,450 SF of existing roof substrate.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Clean and re-coat the roof at ranch state radio site. Roof Cleaning o Remove all dirt, dust, loose debris, biological growth (moss, algae), and contaminants from roof surface using low-pressure mechanical means (e.g., air blowers, brooms, or pressure washers with portable water source). No harsh chemicals or solvents may be used due to surrounding pasture land and environmental sensitivity. Surface must be free of loose material and prepared in a manner acceptable to the roof coating manufacturer. Surface Preparation Repair any minor cracks, seams, or penetrations as required by manufacturer specifications. Ensure cement substrate is clean, dry, and sound prior to coating application. Remove existing roof coating. Remove the existing roof coating. Repair any minor cracks, seams, or penetrations in the cement slab roof as required by manufacturer.
Posted Date
Dec 10, 2025
Due Date
Dec 31, 2025
Release: Dec 10, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Dec 31, 2025
Clean and re-coat the roof at ranch state radio site. Roof Cleaning o Remove all dirt, dust, loose debris, biological growth (moss, algae), and contaminants from roof surface using low-pressure mechanical means (e.g., air blowers, brooms, or pressure washers with portable water source). No harsh chemicals or solvents may be used due to surrounding pasture land and environmental sensitivity. Surface must be free of loose material and prepared in a manner acceptable to the roof coating manufacturer. Surface Preparation Repair any minor cracks, seams, or penetrations as required by manufacturer specifications. Ensure cement substrate is clean, dry, and sound prior to coating application. Remove existing roof coating. Remove the existing roof coating. Repair any minor cracks, seams, or penetrations in the cement slab roof as required by manufacturer.
AvailableTrinity River Authority is soliciting bids to install approximately 51,800 sq ft of silicone roof coating at its General Office in Arlington, TX, to extend roof life, improve waterproofing, and address minor deficiencies without full replacement. Work includes inspection, debris removal, power washing, repair or replacement of damaged membrane sections, re-securing flashings/fasteners, detail patches, priming as required, application of a minimum 20 mils silicone coating, and adherence to manufacturer specs and industry standards. A ten-year warranty against defects in materials or workmanship is required; performance/payment bonds and specified insurance coverages are required where applicable.
Posted Date
-
Due Date
Jan 2, 2026
Release: -
Close: Jan 2, 2026
Trinity River Authority is soliciting bids to install approximately 51,800 sq ft of silicone roof coating at its General Office in Arlington, TX, to extend roof life, improve waterproofing, and address minor deficiencies without full replacement. Work includes inspection, debris removal, power washing, repair or replacement of damaged membrane sections, re-securing flashings/fasteners, detail patches, priming as required, application of a minimum 20 mils silicone coating, and adherence to manufacturer specs and industry standards. A ten-year warranty against defects in materials or workmanship is required; performance/payment bonds and specified insurance coverages are required where applicable.
AvailableRequest for proposals from qualified and manufacturer-approved roofing contractors to clean, prepare, and install a high-performance roof coating system on the Big Gym.
Posted Date
-
Due Date
Jan 12, 2026
Close: Jan 12, 2026
Request for proposals from qualified and manufacturer-approved roofing contractors to clean, prepare, and install a high-performance roof coating system on the Big Gym.
AvailableThis RFP is for furnishing long lead material, including the transformer and switchgear, required for the Metro Transit IL Bus Garage EV Charging Stations.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
This RFP is for furnishing long lead material, including the transformer and switchgear, required for the Metro Transit IL Bus Garage EV Charging Stations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →