Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Ohio Department of Natural Resources is soliciting bids to perform kitchen upgrades at the East End Overlook in Rocky Fork State Park, including installation of commercial kitchen equipment, plumbing and electrical upgrades, and updated architect-designed plans. The contractor must meet prevailing wage and accessibility standards and complete the project by March 31, 2026. Mandatory site visit and question/close dates are listed on the posting; documentation is available from the official OhioBuys posting linked from the aggregator.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes : install 8'x8' indoor walk-in cooler with remote compressor; install a new commercial stainless steel three compartment sink; remove two compartment sink seen in photo below; 14' vent hood with plenum, exhaust fan, and make-up air fan; hood must have fire suppression system; to be installed on the upper left wall located in photo below.
Posted Date
Nov 24, 2025
Due Date
Dec 23, 2025
Release: Nov 24, 2025
Close: Dec 23, 2025
Work includes : install 8'x8' indoor walk-in cooler with remote compressor; install a new commercial stainless steel three compartment sink; remove two compartment sink seen in photo below; 14' vent hood with plenum, exhaust fan, and make-up air fan; hood must have fire suppression system; to be installed on the upper left wall located in photo below.
AvailableState DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Posted Date
Dec 1, 2025
Due Date
Jan 16, 2026
Release: Dec 1, 2025
Close: Jan 16, 2026
State DOC seeks A/E professional services for HVAC/chiller/kitchen boiler replacement at Headquarters: replace 4 AHUs and 51 terminal units, associated med/low-pressure ductwork, air devices, dampers, new electrical/conduit/wiring, and control upgrades tied to the main server. Scope includes full design (civil, structural, mechanical, plumbing, electrical, fire protection), permitting, cost estimating, construction administration, inspections, and closeout. Anticipated construction cost $3,000,000–$4,000,000. Submittal requirements include Standard Form 330, primary contact, SC residency certification, and required licensure.
Provide wastewater lagoon and city park PS upgrades. The project generally includes replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, site work and associated pump work.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Provide wastewater lagoon and city park PS upgrades. The project generally includes replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, site work and associated pump work.
AvailableProvide wastewater lagoon and city park PS upgrades. The project generally includes replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, site work and associated pump work.
Posted Date
-
Due Date
Dec 17, 2025
Close: Dec 17, 2025
Provide wastewater lagoon and city park PS upgrades. The project generally includes replacement of pumps and discharge piping, addition of standby generators, new control panels and canopies, site work and associated pump work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis