Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of approx. 1,219 LF of 6"-8" PVC water line; 960 LF of 6" PVC sanitary sewer; 1,106 LF of 18"-30" RCP and HDPE storm sewer and 3,785 SY of 6" reinforced concrete pavement with curb
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work consists of site land clearing, storm water pipes, catch basins, water mains, sanitary sewers, grading, basing, curb & gutter, asphalt, and all other appurtenances necessary to complete the project.
Posted Date
Dec 22, 2025
Due Date
Feb 3, 2026
Release: Dec 22, 2025
Close: Feb 3, 2026
The work consists of site land clearing, storm water pipes, catch basins, water mains, sanitary sewers, grading, basing, curb & gutter, asphalt, and all other appurtenances necessary to complete the project.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of constructing a connection from the existing trail. The trail also travels through dinglewood park to the intersection of 18th avenue and 13th street. The project is within the city property and public right of way. The project length is approx 4,956 lf and includes a 10' wide concrete trail, landscape improvements, stormwater improvements, and trail amenities. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, and signage. 52 lf san sewer pipe, 8 in, ductile iron, incl. 8in concrete encasement; 43 lf san sewer pipe, 8 in, ductile iron; 2 ea class b conc. dip to rcp transition collar. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 7, 2026
Release: Oct 16, 2025
Close: Jan 7, 2026
Project consists of constructing a connection from the existing trail. The trail also travels through dinglewood park to the intersection of 18th avenue and 13th street. The project is within the city property and public right of way. The project length is approx 4,956 lf and includes a 10' wide concrete trail, landscape improvements, stormwater improvements, and trail amenities. Additional work associated with the project includes minor demolition and clearing, erosion control, grading, and signage. 52 lf san sewer pipe, 8 in, ductile iron, incl. 8in concrete encasement; 43 lf san sewer pipe, 8 in, ductile iron; 2 ea class b conc. dip to rcp transition collar. See outside link.
AvailableThe University of Connecticut is soliciting a consultant to provide project management oversight services for the Energy Savings Performance Contract (ESPC) Phase 2, including project management, administration, quality assurance, owner representation, document control and coordination with contractors. The work covers the Storrs campus and other UConn properties and contemplates energy conservation measures such as steam/condensate line replacement, solar canopies, and building envelope evaluation; the proposed construction budget is approximately $30,000,000 with a program duration of two years. Selection will follow a two-part quality-based selection process (shortlist then proposal/cost phase); the solicitation encourages participation by small and minority businesses.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
The University of Connecticut is soliciting a consultant to provide project management oversight services for the Energy Savings Performance Contract (ESPC) Phase 2, including project management, administration, quality assurance, owner representation, document control and coordination with contractors. The work covers the Storrs campus and other UConn properties and contemplates energy conservation measures such as steam/condensate line replacement, solar canopies, and building envelope evaluation; the proposed construction budget is approximately $30,000,000 with a program duration of two years. Selection will follow a two-part quality-based selection process (shortlist then proposal/cost phase); the solicitation encourages participation by small and minority businesses.
AvailableRelease: Nov 26, 2025
Close: Jan 8, 2026
Bank renovations - phase 2
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →