Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a stormwater pond including excavation (approximately 20,000 CY), storm sewer (approximately 1,800 LF), erosion controls and restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide chip seal (ledge rock) at a competitive and reasonable cost.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Provide chip seal (ledge rock) at a competitive and reasonable cost.
AvailablePremium
Access the largest public sector contact database
The project will consist of providing drilling and blasting services to facilitate the excavation of soil and rock material for the construction of a new sediment pond.
Posted Date
Dec 14, 2025
Due Date
Jan 14, 2026
Release: Dec 14, 2025
Close: Jan 14, 2026
The project will consist of providing drilling and blasting services to facilitate the excavation of soil and rock material for the construction of a new sediment pond.
AvailableThe Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
The Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
AvailableWork consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Posted Date
Sep 20, 2022
Due Date
Oct 11, 2027
Release: Sep 20, 2022
Close: Oct 11, 2027
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis