Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Marshfield
The Project includes the following Work: Holt Road – Remove temporary bridge, demolish old bridge, cast-in-place concrete footersstemwalls, installation of new BridgeCor culvert with aluminum headwalls, rock armoring, roadway construction and associated work. Laird Pond Road – Remove existing culvert, cast-in-place concrete footers-stemwalls, installation of new aluminum arch culvert, rock armoring, roadway construction and associated work. Pigeon Pond Road – Remove existing culvert, precast concrete box culvert installation, rock armoring, roadway construction and associated work. Maple Hill Road – Remove existing culvert, installation of pipe arch culvert with cast-in-place headwalls, rock armoring, roadway construction and associated wor
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Accomack County
Clear and clean the drainage ditch back to its original parameters.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
Accomack County
Close: Dec 5, 2025
Clear and clean the drainage ditch back to its original parameters.
AvailableTown of Erie
Project consists of detention pond improvements including removal of an existing weir wall and orifice plate, installation of a new weir wall, orifice plate, micropool, and trash racks, and installation of a new pond maintenance path from an existing trail to the new pond outlet structure, and all associated.G
Posted Date
Nov 13, 2025
Due Date
Dec 19, 2025
Release: Nov 13, 2025
Town of Erie
Close: Dec 19, 2025
Project consists of detention pond improvements including removal of an existing weir wall and orifice plate, installation of a new weir wall, orifice plate, micropool, and trash racks, and installation of a new pond maintenance path from an existing trail to the new pond outlet structure, and all associated.G
AvailableCity of Rochester
Seneca avenue reconstruction (norton st to east ridge rd).
Posted Date
Nov 17, 2025
Due Date
Dec 16, 2025
Release: Nov 17, 2025
City of Rochester
Close: Dec 16, 2025
Seneca avenue reconstruction (norton st to east ridge rd).
AvailableHamilton County
Replacement plans for bridge #125 atlantic rd over stony creek.
Posted Date
-
Due Date
Nov 24, 2025
Hamilton County
Close: Nov 24, 2025
Replacement plans for bridge #125 atlantic rd over stony creek.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis