Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of furnishing a new package pump house consisting of pumps, piping and all auxiliary components fitted, and delivered to the project site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Premium
Access the largest public sector contact database
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Close: Dec 19, 2025
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
AvailableComplete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Complete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
AvailableComplete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
Posted Date
Dec 4, 2025
Due Date
Jan 5, 2026
Release: Dec 4, 2025
Close: Jan 5, 2026
Complete the electrical installation for the new owner-furnished, factory-built packaged pump station. The pump station enclosure, pumps, and control systems are substantially prewired by the manufacturer; however, the electrical contractor shall provide incoming service to the control panel, grounding of the station, and all conduit, wiring, and terminations necessary to connect field-installed equipment to the factory-supplied terminal blocks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis