Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Charlotte
Charlotte Water is soliciting Statements of Qualifications from engineering firms to provide professional engineering services for the Statesville Road Booster Pump Station Project, which will enhance system reliability and capacity in the 978 Pressure Zone. Scope includes evaluation, design, permitting, bidding support, and construction‑phase services for a new booster pump station.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cape Fear Public Utility Authority
Work consist of booster pump station and waterline interconnect, 16" water transmission main, installed water main crossing, existing 16" water main, existing 12" water main, elevated tank more.
Posted Date
-
Due Date
Nov 18, 2025
Cape Fear Public Utility Authority
Close: Nov 18, 2025
Work consist of booster pump station and waterline interconnect, 16" water transmission main, installed water main crossing, existing 16" water main, existing 12" water main, elevated tank more.
AvailableLauderdale County
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
Posted Date
Oct 21, 2025
Due Date
Nov 18, 2025
Release: Oct 21, 2025
Lauderdale County
Close: Nov 18, 2025
The Project consists of a new elevated water tower, booster pump station and associated water main piping.
AvailableCape Fear Public Utility Authority
Project consists of construction of a new booster pump station with piping, pumps, building, electrical, etc. As well as a new transmission pipeline to tie into the existing system.
Posted Date
Nov 10, 2025
Due Date
Nov 18, 2025
Release: Nov 10, 2025
Cape Fear Public Utility Authority
Close: Nov 18, 2025
Project consists of construction of a new booster pump station with piping, pumps, building, electrical, etc. As well as a new transmission pipeline to tie into the existing system.
AvailableEdgecombe County
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Edgecombe County
Close: Dec 16, 2025
The project includes the following work: 1. replace booster pump station building w/ associated piping. 2. permanent back-up generator. 3. SCADA. 4. (3) skid mounted booster pumps. 5. chemical feed system. 6. (2) 16 x 16 x 12-inch tapping sleeves with 12-inch valves. 7. earthwork. 8. 12 FT gravel drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis