Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Invitation to bid for full‑depth roadway reconstruction of Campville Road in Litchfield, CT (approx. 2,285 feet), including underdrain installation and related sitework. Requires CTDOT prequalification, bid bond (≥5% of bid), performance/payment bonds, compliance with prevailing wage and equal employment requirements, and completion within 45 consecutive calendar days after Notice to Proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes reconstruction of streets, utilities (water main, storm, and sanitary sewer) and associated items in the park.
Posted Date
Jan 26, 2026
Due Date
Feb 23, 2026
Release: Jan 26, 2026
Close: Feb 23, 2026
The project includes reconstruction of streets, utilities (water main, storm, and sanitary sewer) and associated items in the park.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Linwood Township is soliciting bids for the Martin Lake Road and 227th Avenue Reconstruction Project in Anoka County, Minnesota. Bids will be received electronically via QuestCDN until 11:00 a.m. on Tuesday, February 10, 2026, after which they will be reviewed, accepted, and read aloud. The project includes roadway reconstruction with work items such as clearing and grubbing, excavation, full-depth reclamation, asphalt mixtures, drainage structures, and restoration.
Posted Date
Jan 21, 2026
Due Date
Feb 10, 2026
Release: Jan 21, 2026
Close: Feb 10, 2026
Linwood Township is soliciting bids for the Martin Lake Road and 227th Avenue Reconstruction Project in Anoka County, Minnesota. Bids will be received electronically via QuestCDN until 11:00 a.m. on Tuesday, February 10, 2026, after which they will be reviewed, accepted, and read aloud. The project includes roadway reconstruction with work items such as clearing and grubbing, excavation, full-depth reclamation, asphalt mixtures, drainage structures, and restoration.
Project includes approx. of rotomilling existing asphalt pavement to specified depths, preparation of milled surfaces, placement and compaction of asphalt overlays, and full-depth roadway reconstruction. Reconstruction shall include removal and disposal of existing pavement, repair or replacement of base and subgrade materials as required, construction of new pavement sections, and installation of new curb and gutter in reconstruction areas. Additional work includes traffic control, protection of campus facilities, coordination to maintain access during construction, and all incidental work necessary to complete the project in accordance with project plans, specifications, and applicable standards.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
Project includes approx. of rotomilling existing asphalt pavement to specified depths, preparation of milled surfaces, placement and compaction of asphalt overlays, and full-depth roadway reconstruction. Reconstruction shall include removal and disposal of existing pavement, repair or replacement of base and subgrade materials as required, construction of new pavement sections, and installation of new curb and gutter in reconstruction areas. Additional work includes traffic control, protection of campus facilities, coordination to maintain access during construction, and all incidental work necessary to complete the project in accordance with project plans, specifications, and applicable standards.
Work includes temporary controls and bmps, 400 sy of remove concrete flat work, 175 SY of remove concrete waterway, 24730 SY of remove asphalt pavement (plan quantity), 500 Cy of granular borrow, 500 CY of over excavation, 175 SY of concrete waterway, 14 ea pedestrian access ramp, 1 ea 6 inch resilient wedge gate valve, 1 ea cut, cap, & and abandon waterline, 400 SY of remove concrete flat work, 8 ea pedestrian access ramp, 210 cut, cap, & and abandon waterline, 54 ea reconstruct culinary water service.
Posted Date
Jan 15, 2026
Due Date
Feb 3, 2026
Release: Jan 15, 2026
Close: Feb 3, 2026
Work includes temporary controls and bmps, 400 sy of remove concrete flat work, 175 SY of remove concrete waterway, 24730 SY of remove asphalt pavement (plan quantity), 500 Cy of granular borrow, 500 CY of over excavation, 175 SY of concrete waterway, 14 ea pedestrian access ramp, 1 ea 6 inch resilient wedge gate valve, 1 ea cut, cap, & and abandon waterline, 400 SY of remove concrete flat work, 8 ea pedestrian access ramp, 210 cut, cap, & and abandon waterline, 54 ea reconstruct culinary water service.