Summary
Work includes: Maple Street (West Ave to U.S. Route 1) - 440 TN, 2.0" surface course HMA superpave 0.5" level 2; 3,743 SY, bituminous concrete milling (0"- 4"); 10 EA, reset manhole (as needed); 600 SY, concrete sidewalk (at and around 3" raised crosswalk); 100 SF, Concrete sidewalk ramp (to be used at specified locations at area D); 800 SF, speed table (3" height) (0.375" HMA); 30 CY, furnishing and placing topsoil; 800 SF, stamped asphalt surfacing system; 400 LF, 4" white epoxy resin pavement markings; 700 LF, 4" double yellow epoxy resin pavement markings; 300 SF, epoxy resin pavement markings - symbols and legends. West Avenue (Maple St to I-95N) - 1,865 TN, 2.0" surface course HMA superpave 0. 5" level 2; 15,834 SY, bituminous concrete milling (0"-4"); 1,500 SF, Concrete sidewalk (at areas A, C, & J); 330 SF, Precast concrete paver sidewalk and driveway - other (to be used in areas A, B1, B2, and J). See attached file.