Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx. 242 SF of construction signs; 1 LS of clearing site; 315 CY of 6” HMA Profile Milling;1,000 SY of Hot Mix Asphalt Pavement Repair, 6” Depth (If & Where as Directed); 1,800 TN of Hot Mix Asphalt 12.5M-64 Surface Course, 2” Thick(Incl. Sweeping & Tack Coat); 541 LF of 15” High Density Polyethylene Pipe; Tangent Guiderail Terminal;1,400 SY of Fertilizing and Seeding, Type A-3.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 675 CY excavation; 400 CY granular material, type b; 1,190 LF fence, misc. : wood fence (bikeway railing per grove city c-gc-97); 1,500 SY construction seeding and mulching; 1,830 LF perimeter filter fabric fence; 3,000 SY seeding and mulching; 250 CY topsoil (t=3"); 2 EA precast concrete manhole (c-gc-03); 1,070 LF6" pipe underdrain; 10 LF 12" storm pipe, with type 1 bedding, with item 912 compacted granular material; 1,220 lf full depth pavement sawing; 240 SY pavement repair; 6,370 SY pavement planing, asphalt concrete (t=1. 25"); 300 CY aggregate base (t=6"); 230 CY asphalt concrete surface course type 1; 56 LF ground mounted sign support.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
Work includes 675 CY excavation; 400 CY granular material, type b; 1,190 LF fence, misc. : wood fence (bikeway railing per grove city c-gc-97); 1,500 SY construction seeding and mulching; 1,830 LF perimeter filter fabric fence; 3,000 SY seeding and mulching; 250 CY topsoil (t=3"); 2 EA precast concrete manhole (c-gc-03); 1,070 LF6" pipe underdrain; 10 LF 12" storm pipe, with type 1 bedding, with item 912 compacted granular material; 1,220 lf full depth pavement sawing; 240 SY pavement repair; 6,370 SY pavement planing, asphalt concrete (t=1. 25"); 300 CY aggregate base (t=6"); 230 CY asphalt concrete surface course type 1; 56 LF ground mounted sign support.
AvailableClose: Mar 3, 2026
Provide roadway improvement project.
AvailableRoadway, drainage, and safety improvements to Road (CR 544).
Posted Date
Dec 31, 2025
Due Date
Feb 5, 2026
Release: Dec 31, 2025
Close: Feb 5, 2026
Roadway, drainage, and safety improvements to Road (CR 544).
AvailableWork consists of improving the pavement structure to the existing unpaved roadway for approximately 2.132 miles.
Posted Date
Dec 11, 2025
Due Date
Feb 13, 2026
Release: Dec 11, 2025
Close: Feb 13, 2026
Work consists of improving the pavement structure to the existing unpaved roadway for approximately 2.132 miles.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis