Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes design and install a site-specific metal roof repair and restoration solution.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for Qualifications for Owner's Project Management Services for the roof restoration of the Lincoln-Sudbury Regional High School.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Request for Qualifications for Owner's Project Management Services for the roof restoration of the Lincoln-Sudbury Regional High School.
Premium
Access the largest public sector contact database
Experienced professionals who can provide both consulting and project management services for the successful design, procurement, and installation of a new roofing system. The scope of the project includes the removal of the existing roofing system, detailed assessment, design of a new roof system, and overall project management to final completion. The building is a mixed-use industrial/commercial property, and the project will involve approx. 102,000 SF of flat roof. This will include removal of the old membrane (approximately 40 years old), possible asbestos mitigation, possible concrete roof deck repair, installation of new insulation and membrane.
Posted Date
Nov 6, 2025
Due Date
Dec 19, 2026
Release: Nov 6, 2025
Close: Dec 19, 2026
Experienced professionals who can provide both consulting and project management services for the successful design, procurement, and installation of a new roofing system. The scope of the project includes the removal of the existing roofing system, detailed assessment, design of a new roof system, and overall project management to final completion. The building is a mixed-use industrial/commercial property, and the project will involve approx. 102,000 SF of flat roof. This will include removal of the old membrane (approximately 40 years old), possible asbestos mitigation, possible concrete roof deck repair, installation of new insulation and membrane.
AvailableInstalling new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
AvailableProvide construction services for the liberty street creek restoration project.
Posted Date
Dec 2, 2025
Due Date
Dec 23, 2025
Release: Dec 2, 2025
Close: Dec 23, 2025
Provide construction services for the liberty street creek restoration project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis